My WebLink
|
Help
|
About
|
Sign Out
Search
DWR_3539100
DWR
>
Division Filing
>
2019
>
12
>
DWR_3539100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 9:50:38 AM
Creation date
12/6/2019 3:32:24 PM
Metadata
Fields
Template:
Division Filing
Document Date
12/6/2019
Document Type - Division Filing
Report/Study
Division
2
WDID
1707701
Subject
PILOT PROJECT - COLORADO SPRINGS UTILITIES SUPER DITCH HB1248 STATE ENGINEERS DETERMINATION
DWR Send/Recipient
KEVIN REIN, STATE ENGINEER
Outside Send/Recipient
ALEX FUNK, CWCB, COLORADO SPRINGS UTILITIES, SUPER DITCH
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Nomination of Parcels for Dry -up Credits in Replacement Plans <br />Beginning with the 2006-07 Replacement Plan year, plan proponents will need to select <br />parcels for dry -up credit utilizing the mapping developed by the CDWR for any dry -up credit to <br />be claimed under the provisions of Rule 6 of the Amended Rules and Regulations Governing <br />the Diversion and Use of Tributary Ground Water in the Arkansas River Basin, Colorado <br />(Amended Use Rules). The CDWR mapping will include areas shown as irrigated in either the <br />1985 aerial photos evaluated by Colorado or the 1980 aerial photos evaluated by Kansas. <br />Parcels identified within this mapped area that have not had shares moved to different <br />locations will be eligible for dry -up crediting under Rule 6 provisions. <br />Mapped parcels shall be provided in GIS format compatible with the ArcView software used by <br />the CDWR unless provisions are made to coordinate mapping with the Division 2 Office in <br />Pueblo. Mapping for nominated parcels must be provided with the March 1, 2006 <br />Replacement Plan submittals in order to ensure timely approval of replacement sources for the <br />2006-07 Plan Year and by March 1st of each succeeding plan year. <br />Example of CDWR Mapping <br />
The URL can be used to link to this page
Your browser does not support the video tag.