Laserfiche WebLink
3. In Delivery Years, the Super Ditch shall take delivery of the Surface Return <br /> Flows attributable to the Fallowed Shares and return these tote Arkansas River in time, <br /> location, and amount as required byte Pilot Project Engineering. CS-U shall have no <br /> obligation to replace the Surface Return Flows. <br /> Delivery Years, the Super Ditch shall take deliveries of water in an amount <br /> equal to the Delayed Return Flows attributable to the Fallowed Shares in excess of the amount <br /> owed the same month of delivery and, in lieu of returning this water tote Arkansas River <br /> through recharge facilities or other methods, the Super Ditch shall, at no cost to CS-U, exchange <br /> this water to Pueblo Reservoir for municipal uses by CS-U (the "Pilot Project Replacement <br /> Water"). The Pilot Project Replacement Water shall be fully consumable in CS-U's municipal <br /> system and made available pursuant to the procedures set forth in paragraph 29.P of the decree <br /> entered in Case No. 05CW96. Within 30 days of the delivery of any Pilot Project Replacement <br /> Water to Pueblo Reservoir, the Super Ditch shall provide a schedule to CS-U specifying the <br /> additional and cumulative Delayed Return Flow Obligations during the Lagging Period as a <br /> result oft e delivery of such Pilot Project Replacement Water and the previous operations oft e <br /> CS-U/Super Ditch Pilot Project (the "Projection of Delayed Return Flows Owed tote River."). <br /> 5. CS-U shall coordinate with the Division Engineer to replace the Monthly Delayed <br /> Return Flow Obligations during the Lagging Period in time, location, and amount by making <br /> releases of water from Lake Meredith or other facilities available to CS-U asspecified in the <br /> Projection of Delayed Return Flows Owed to the River using fully consumable sources of water <br /> legally and physically available to CS-U in Lake Meredith or such other facilities. CS-U shall <br /> not be required to replace any of the Monthly Delayed Return Flow Obligations not shown in the <br /> Projection of Delayed Return Flows Owed tote River. <br /> 6. The Super Ditch shall be solely responsible for acquiring the Pilot Project <br /> Replacement Water from the Participating Irrigators, or otherwise, pursuant to separate contracts. <br /> Super Ditch shall also be solely responsible, financially or otherwise, for obtaining all necessary <br /> approvals forte delivery of Pilot Project Replacement Water to Pueblo Reservoir, including any <br /> necessary permits or other governmental approvals. <br /> 7. CS-U shall be solely responsible for delivering Pilot Project Replacement Water <br /> to its municipal water system under the Exchange decreed in Case No. 05CW96 (Div. 2) (the <br /> "05CW96 Exchange") or otherwise. CS-U shall also be solely responsible, financially or <br /> otherwise, for obtaining all necessary approvals for the delivery of Pilot Project Replacement <br /> Water from Pueblo Reservoir to its municipal water system, including any necessary permits or <br /> other governmental approvals. CS-U may use Pilot Project Replacement Water for any lawful <br /> purpose. <br /> 8. The Super Ditch shall be responsible for providing the necessary storage space for <br /> all Pilot Project Replacement Water that is delivered to CS-U in Pueblo Reservoir until such time <br /> as the water is moved out of storage under the 05CW96 Exchange or otherwise; provided that, in <br /> no event, shall the Super Ditch be required to store CS-U's Pilot Project Replacement Water in <br /> Pueblo Reservoir after December 31 of the year in which the water was delivered to CS-U. <br /> However, if CS-U desires to store its Pilot Project Replacement Water for a longer to in <br /> Pueblo Reservoir,the parties shall cooperate with each other to secure storage of such water in the <br /> Long-Term Excess Capacity Storage Account maintained by the Lower Arkansas Valley Water <br /> lof 7 <br />