My WebLink
|
Help
|
About
|
Sign Out
Search
DWR_3538977
DWR
>
Division Filing
>
2019
>
12
>
DWR_3538977
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2020 9:18:56 PM
Creation date
12/6/2019 1:34:52 PM
Metadata
Fields
Template:
Division Filing
Document Date
8/16/2019
Document Type - Division Filing
Report/Study
Division
2
WDID
1707701
Subject
PILOT PROJECT - COLORADO SPRINGS UTILITIES SUPER DITCH HB1248 PILOT PROJECT APPLICATION 2019
Outside Send/Recipient
CRIAG LIS, MARTIN AND WOOD ON BEHALF OF COLORADO SPRINGS AND SUPER DITCH
Tags
DWR Re-OCR
Description:
Signifies Re-OCR Process Performed on or after 10/6/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
provided that,in no event,shall the Super Ditch be required to store CS-U's Pilot Project <br /> ATM Water in Pueblo Reservoir after December 31 of the year in which the water was <br /> delivered to CS-U. However,if CS-U desires to store its Pilot Project ATM Water for a <br /> longer term in Pueblo Reservoir,the parties shall cooperate with each other to secure <br /> storage of such waterin the Long-Tenn Excess Capacity Storage Account maintained by <br /> the Lower Ark District, <br /> 6.2. CS-U shall bear any evaporative and transit losses incurred after the water is delivered <br /> into Super Ditch's storage space in Pueblo Reservoir. <br /> 7. Future Commitments <br /> 7.1. Both parties acknowledge CS-U's need to plan for and secure a perpetual water supply <br /> for its customers;and both Parties acknowledge the Super Ditch's desire to preserve <br /> irrigated agricultural in the Lower Arkansas Valley.Towards these ends,the Parties <br /> agree to meet at least annually with the Lower Ark District to revisit the terms of this <br /> Agreement,and the operation of the Pilot Project.Topics to address at these meetings <br /> include,but are not limited to, the use of conservation easements,covenants,or other <br /> real property interests to secure a permanent supply of leased water; an application for <br /> conditional rights of exchange to secure a permanent means of transporting Pilot Project <br /> ATM Water to Pueblo Reservoir; use of SWSPs and IWSAs to increase both the number <br /> of years in ten that CS-U can call for Pilot Project ATM Water,and the amount of Pilot <br /> Project ATM Water that CS-U can call for annually;and the extension of the Pilot <br /> Project into a long-term agreement between CS-U,the Super Ditch,and the Lower Ark <br /> District. <br /> 8. Notice <br /> 8.1. Any notice required under this agreement shall be in writing and shall be delivered by <br /> courier service delivery(such as Federal Express),by first-class mail,or by electronic <br /> mail at the addresses specified below and shall be deemed duly served,given,or <br /> delivered when received: <br /> If to the Super Ditch: <br /> Lower Arkansas Valley Super Ditch Company <br /> Attn: President <br /> 801 Swink Avenue <br /> Rocky Ford,CO 81067 <br /> Electronic Mail Address(c/o General Manager,Lower Arkansas Valley Water <br /> Conservancy District): <br /> iwinnerLy,dowerark.com <br /> 6 <br /> Exhibit A <br />
The URL can be used to link to this page
Your browser does not support the video tag.