Laserfiche WebLink
r <br />s <br />-qrti 8 MOORE <br />Homestake Mining Company <br />July 1, 1975 <br />Page -2- <br />At the completion of our Phase I studies, we did <br />not feel that it could be conclusively demonstrated that the <br />dam was stable. Therefore, we began Phase 1I, which included <br />field investigations, laboratory testing, engineering analy- <br />ses, and preparation of the attached report. Based on the <br />results of the Phase II studies, it is our opinion that the <br />.existing embankment is stable and will remain stable as tail- <br />ings are deposited in the reservoir. <br />We appreciate the opportunity of performing this <br />investigation for you. If you have any Questions concern,-- <br />ing this report, or if we can be of further service, please <br />do not hesitate to contact us. <br />JRS/REV/dls <br />cc: Davis Engineering Services, Inc. <br />Very truly yours, <br />DAMES & MOORE <br />James R. Swai�rgood <br />Partner <br />Ronald E. Versaw <br />Project Eng,i.neer <br />