Laserfiche WebLink
U <br />TABLE 2 <br />CYANIDE CONCENTRATIONS IN <br />PIEZOMETERS DOWNSTREAM FROM SLURRY WALL <br />FREE CYANIDE (mg/1) <br />SAMPLE POINT NO. <br />DATE 25 26 29 30 31 <br />July 14, 1981 <br />23 <br />33 <br />- <br />- - <br />August 3, 1981 <br />25 <br />33 <br />- <br />- - <br />September 8, 1981 <br />31 <br />32 <br />- <br />- - <br />October 7, 1981 <br />32 <br />33 <br />- <br />- - <br />November 2, 1981 <br />29 <br />28 <br />- <br />- - <br />December 7, 1981 <br />34 <br />26 <br />- <br />- - <br />February 2, 1982 <br />28 <br />22 <br />- <br />- - <br />March 8, 1982 <br />25 <br />16 <br />- <br />- - <br />April 6, 1982 <br />26 <br />12 <br />- <br />- - <br />June 2, 1982 <br />16 <br />10 <br />- <br />- - <br />July 27, 1982 <br />14 <br />13 <br />3.2 <br />0.6 - <br />August 6, 1982 <br />14 <br />20 <br />3.1 <br />0.1 - <br />August 17, 1982 <br />13 <br />20 <br />2.3 <br />0.4 - <br />September 2, 1982 <br />o <br />17 <br />19 <br />0.6 <br /><0.01 <0.01 <br />September 14, 1982 <br />26 <br />19 <br />1.6 <br />0.02 - <br />January 17, 1983 <br />0.04 <br />0.03 <br />0.11 <br />0.01 0.02 <br />Notes: 1. Slurry wall completed 3uly 16, 1982. <br />,Piezometers were evacuated (bailed out) on September 9, 1982. <br />3. See Figure 2 for location of sample paints. <br />