Laserfiche WebLink
71 Summary Results for Subbasin "Subbasin-1 " —ow— Ca <br />Project: Copper -Spur Simulation Run: 25 -year <br />Subbasin:Subbasin-1 <br />Start of Run: 21Dcc2017, 00:00 Basin Modcl: CopperSpur <br />End of Run: 22Dec2017, 00:00 Meteorologic Model: 25 -year <br />Compute Time:21Dec2017, 10:15:32 Control Specifcations:24hour10min <br />Volume Units: 0 I *ACFr <br />Computed Results <br />Peak Discharge: 95.3 (CFS) <br />Precipitation volume: - <br />Loss Volume: 412.8 (AC -FT) <br />Excess Volume: 30.9 (AC -FT) <br />Date/Time of Peak Discharge:21Dec2017, 04:10 <br />Direct Runoff Volume: 30.6 (AC -FT) <br />Baseflow Volume: 0.0 (AC -FT) <br />Discharge Volume: 30.6 (AC -FT) <br />HMS Model Results for Copper Spur Basin <br />