Laserfiche WebLink
BOSS BREACH version 1.10 PAGE 42 <br /> PROJECT TITLE Hartman Retention Dam lowered 3- <br /> PROJECT NUMBER 720135 1/08/2002 <br /> OUTPUT RESULTS AT TIME OF PEAK OUTFLOW <br /> ---------------------------------------- <br /> Elapsed Time (hr, TP) 1.540 <br /> Spillway Outflow (cfs) 14. <br /> Breach outflow (cfs, QBP) 578. <br /> Total Outflow (cfs, QP) 592_ <br /> Breach Top Width (ft, BRW) 5.7 <br /> Breach Bottom Width (ft, Bo) 5.7 <br /> Breach Side Slope Relative to Vertical (degrees, 2) .00 <br /> OUTPUT RESULTS AT END OF BREACH ANALYSIS : <br /> ------------------------------------------ <br /> Breach Depth (ft, BRD) 16.0 <br /> Breach Bottom Elevation (ft MSL, HC) 6.0 <br /> Breach Side Slope Relative to Vertical (degrees, AGL) 31.00 <br /> Reservoir Water Surface Elevation (ft MSL, BY) 7.7 <br />