Laserfiche WebLink
, BOSS BREACH version 1.10 S O !V <br /> PAGE 36 <br /> PROJECT TITLE Hartman Retention Dam lowered 3' <br /> PROJECT NUMBER 720135 1/08/2002 <br /> SUMMARY OF OUTPUT RESULTS <br /> --------------------------- <br /> GENERAL RESULTS : <br /> ----------------- <br /> Total Number of Iterations 0 <br /> Time of Breach Failure (hr, TFHI) 1.03 <br /> Total Time-Steps Used (I) 1218 <br /> Total Elapsed Time (hr, T) 3.045 <br /> Outflow Hydrograph Rising Limb Duration (hr, IRS) .693 <br /> Time at which Significant Rise in Outflow Begins (hr, IS) .000 <br /> Dam Top Elevation (ft MSL, HU) 22.00 <br /> Outflow at Time Zero (cfs, QO) .0 <br /> Simplified Time of Breach Failure (hr, TFH) .000 <br /> TFH - Time of failure (hr) which is a linear equivalent of <br /> the outflow hydrograph rising limb duration (TRS) obtained <br /> by using the simplified dam-break discharge equation. <br /> TFHI - Time of failure (hr) which is a linear equivalent of <br /> the outflow hydrograph rising limb duration (IRS) obtained <br /> by integrating breach outflow (QB) versus time from <br /> T=0 to T=Peak Outflow (TP) . <br /> A IL - Furl aY owfj <br /> dLAU1-K �o yn -e1 ltw�- �a�. Alf <br /> I� <br /> q( ��� UGj <br />