Laserfiche WebLink
BOSS BREACH version 1.10 PAGE 40 , <br /> PROJECT TITLE Hartman Retention Dam unimproved <br /> PROJECT NUMBER 720135 1/OS/2002 <br /> OUTPUT RESULTS AT TIME OF PEAK OUTFLOW <br /> ---------------------------------------- <br /> Elapsed Time (hr, TP) 1.695 <br /> Spillway Outflow (cfs) 3. <br /> Breach Outflow (cfs, QBP) 699. <br /> Total Outflow (cfs, QP) 702. <br /> Breach Top Width (ft, BRW) 6.1 <br /> Breach Bottom Width (ft, BO) 6.1 <br /> Breach Side Slope Relative to Vertical (degrees, Z) .00 <br /> OUTPUT RESULTS AT END OF BREACH ANALYSIS : <br /> ------------------------------------------ <br /> Breach Depth (ft, BED) 16.0 <br /> Breach Bottom Elevation (ft MSL, HQ 6.0 <br /> Breach Side Slope Relative to Vertical (degrees, AGL) 31.00 <br /> Reservoir Water Surface Elevation (ft MSL, NY) 7.9 <br />