Laserfiche WebLink
EM <br />"We hold that when the Engineers prove that the water <br />right holder has not used the decreed point of <br />diversion for ten years or more, the Engineers trigger <br />the rebuttable presumption of abandonment under <br />section 37-92-402(11). Once triggered, the burden shifts <br />to the water right holder to demonstrate a lack of <br />intent to abandon." <br />