My WebLink
|
Help
|
About
|
Sign Out
Home
Search
DWR_2810793
DWR
>
Reference Library
>
2015
>
10
>
DWR_2810793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2018 2:30:48 PM
Creation date
10/27/2015 3:19:42 PM
Metadata
Fields
Template:
Reference Library
Title
DO'S AND DON'T OF POND CONSTRUCTION
Author/Source
ERIN LIGHT, DIVISION ENGINEER
BRIAN ROMIG, WATER COMMISSIONER
DIVISION OF WATER RESOURCES
Keywords
POND, DAM, STORAGE, LIABILITY, LIVESTOCK, TANK, STATUTE, ADMINISTRATION, CHANNEL
Document Type - Reference Library
Presentations
Document Date
9/8/2015
Year
2015
Team/Office
Division 6 Office
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Type of Ponds and Dams <br />Jurisdictional <br />IMPORTANT <br />•If you own and/or operate a jurisdictional dam, DO NOT make any <br />modifications or repairs to the dam or outlet structure without <br />first notifying our office, i.e. Dana Miller – Dam Safety Engineer. <br />•DO NOT think you can construct a dam or modify a dam and then <br />ask for forgiveness and get it approved after the fact. <br />Doing either one of these things can cost you more money and a <br />lot of headache in the long run. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.