My WebLink
|
Help
|
About
|
Sign Out
Home
Search
DWR_2810793
DWR
>
Reference Library
>
2015
>
10
>
DWR_2810793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2018 2:30:48 PM
Creation date
10/27/2015 3:19:42 PM
Metadata
Fields
Template:
Reference Library
Title
DO'S AND DON'T OF POND CONSTRUCTION
Author/Source
ERIN LIGHT, DIVISION ENGINEER
BRIAN ROMIG, WATER COMMISSIONER
DIVISION OF WATER RESOURCES
Keywords
POND, DAM, STORAGE, LIABILITY, LIVESTOCK, TANK, STATUTE, ADMINISTRATION, CHANNEL
Document Type - Reference Library
Presentations
Document Date
9/8/2015
Year
2015
Team/Office
Division 6 Office
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
What to do before you Construct <br /> On Channel <br /> Are you constructing a dam, expanding the width of the channel, or <br />digging into the channel when dry to expose water <br /> Constructing a Dam <br /> A low-level outlet must be installed (or other means of bypassing <br />ALL out-of-priority diversions) <br /> Expanding the Width of the Channel <br /> In essence ground water has been exposed and a well permit is <br />required <br /> Digging in a Dry Channel <br /> In essence ground water has been exposed and a well permit is <br />required
The URL can be used to link to this page
Your browser does not support the video tag.