My WebLink
|
Help
|
About
|
Sign Out
Search
DWR_2810793
DWR
>
Reference Library
>
2015
>
10
>
DWR_2810793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2018 2:30:48 PM
Creation date
10/27/2015 3:19:42 PM
Metadata
Fields
Template:
Reference Library
Title
DO'S AND DON'T OF POND CONSTRUCTION
Author/Source
ERIN LIGHT, DIVISION ENGINEER
BRIAN ROMIG, WATER COMMISSIONER
DIVISION OF WATER RESOURCES
Keywords
POND, DAM, STORAGE, LIABILITY, LIVESTOCK, TANK, STATUTE, ADMINISTRATION, CHANNEL
Document Type - Reference Library
Presentations
Document Date
9/8/2015
Year
2015
Team/Office
Division 6 Office
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Administration of Water Stored in Ponds <br />If a pond is on-channel, the dam must have a low-level outlet <br />Without such outlet, ponds will be required to pump out <br />water with a 1 year grace period. <br />If off-channel, pond must have capability to shut off flow into the <br />pond <br />Without augmentation plan, during a call water will be <br />diverted out of the pond according to the evaporation rate. <br /> <br />Augmentation ponds must have staff gages. Accuracy otherwise? <br />For ponds to get credit for anything other use than “evap”; <br />pump, ditch, must have a measuring device
The URL can be used to link to this page
Your browser does not support the video tag.