Laserfiche WebLink
•Move in,rig up drilling rig <br />•Drill surface hole <br />•Run surface casing <br />•Cement surface casing <br />•Drill production hole <br />•Run logging tools <br />•Run and cement productioncasing <br />•Perforate casing <br />•Frac reservoir (if needed) <br />•Cleanout wellbore <br />•Run tubing (and pump if needed) <br />•Rig down,move off drilling rig <br />•Install wellhead <br />•Install pump jack (if needed)