Laserfiche WebLink
Dam Safety Program Activities•2005 –5 new dam plans and specifications reviewed and approved.–37 plans for alteration, modification or enlargement reviewed and approved.–$60 million in construction–Additional storage as a result of these actions, 6,740 AF –4 hydrology studies for IDF reviewed and approved.–616 dam safety inspections performed.–194 construction inspections. –173 special inspections.•2005 - 2006–Revision of Dam Safety Rules •PMP reduction based on elevation (10-30 % reduction PMP)•Technical updates and design standards•Extreme Precipitation Analysis Tool (EPAT)–Risk-based decision making integration in program implementation.