My WebLink
|
Help
|
About
|
Sign Out
Search
DWR_2810021
DWR
>
Reference Library
>
2015
>
10
>
DWR_2810021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2018 2:29:28 PM
Creation date
10/27/2015 9:49:35 AM
Metadata
Fields
Template:
Reference Library
Title
AWSE: GUANELLA DAM - COOPERATIVE DROUGHT RESPONSE
Author/Source
STEVE JAMIESON, P.E.
W.W. WHEELER AND ASSOCIATES, INC.
Keywords
AWSE, DAM, DROUGHT, GUANELLA, GOLDEN, WATER SUPPLY, PROJECT, RESERVOIR, GEOLOGY, DECREE, SEEPAGE, PERMIT, CONSTRUCT, FLOOD, SPILLWAY, EMBANKMENT
Document Type - Reference Library
Presentations
Document Date
5/18/2005
Year
2005
Team/Office
Denver Office
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
DAM FOUNDATION SEEPAGE CONTROLDAM FOUNDATION SEEPAGE CONTROLDAM FOUNDATION SEEPAGE CONTROL•Depth to top of foundation silt varied from 20 to 70 feet•Groundwater was shallow (< 10 feet deep)•Conventional cutoff trench would be difficult and expensive because of dewatering requirements•Soil-bentonite barrier wall selected••Depth to top of foundation silt varied Depth to top of foundation silt varied from 20 to 70 feetfrom 20 to 70 feet••Groundwater was shallow Groundwater was shallow (< 10 feet deep)(< 10 feet deep)••Conventional cutoff trench would be Conventional cutoff trench would be difficult and expensive because of difficult and expensive because of dewatering requirementsdewatering requirements••SoilSoil--bentonite barrier wall selectedbentonite barrier wall selected
The URL can be used to link to this page
Your browser does not support the video tag.