Laserfiche WebLink
Recovery Effort — Hydrography <br />• Set up 7 temporary gages for administration <br />— 224 <br />hours to <br />install (2 FTE x <br />2 days x <br />7 gages) <br />— 336 <br />hours to <br />rate (correlate <br />stage to <br />flow) <br />(1 FTE x 4 hours x 12 measurements x 7 gages) <br />Rebuild/repair 25 permanent gages <br />— Approximately $500,000 in damaged infrastructure <br />• $100,000 in electronics <br />— 2500 <br />FTE <br />hours <br />to <br />install (2.5 FTE x 40 hours/gage) <br />— 1200 <br />FTE <br />hours <br />to <br />rate <br />• DWR pursuing FEMA grant to fund repairs <br />