Laserfiche WebLink
SUGGESTIONS for RULES CHANGES <br />Rule 10.3 - Well Casing <br />10.3.1 -Require Schedule 40 for steel and PVC <br />1 0.3.2 -Minimum OD of steel production <br />casing 5.5625 in. <br />1 0.3.3 -Change minimum steel wall thickness <br />to .219 in., PVC to Schedule 40 <br />Rule 10.4 - Construction Procedures <br />Centralizer Spacincr <br />10.4.1 - Distance between <br />not exceed 40 feet for PVC <br />steel <br />centralizers shall <br />and 42 feet for <br />