Laserfiche WebLink
STAGE - STORAGE - DISCHARGE <br />WATER SURFACE STAGE STORAGE (AF) DISCHARGE (CFS) <br />OPERATING 5248 0 0 <br />3 <br />5249 35.05 11.00 <br />172662.02 <br />5250 76.78 41.00 <br />2180069.98 <br />5251 124.24 54.89 <br />SPILLWAY 5251.4 146.47 56.54 <br />172719.34 <br />1 <br />5252 176.73 131.94 3.75" BRASS CAP <br />5253 234.43 401.15 <br />5254 297.91 820.03 <br />5255 368.94 1386.72 <br />DAM CREST 5255.4 399.69 1655.70 <br />CONTROL POINTS <br />CONTROL POINT <br />NUMBER NORTHING EASTING <br />1 172529.47 2179566.89 <br />2 172570.78 2179620.55 <br />3 172615.10 2179683.13 <br />4 172662.02 2179778.69 <br />5 172709.79 2180069.98 <br />6 172717.14 2180638.65 <br />7 172718.62 2180739.73 <br />8 172719.34 <br />1 <br />2180850.49 <br />f' I <br />i <br />i <br />i <br />j <br />tengOverflow Channel _ 5240 ` REMOVE EXISTING 18" PIPE AND { CONTROL POINT TYP. <br />L <br />NEW 30" RC <br />STRUCTURE. <br />OUTLET <br />f ' <br />EE <br />STRUCTURE, ILTER DIAPHRAGM, I <br />TABLE THIS ET <br />DERDRAIN AND LOW __ -_ _ _ -.._'^ _ -- -----5245- RESTORE EXISTING -_ - -.. _ - - -- <br />5i545TAILWATERBASIN. SEE SHEET -DAM CREST __ _ <br />HORIZONT AL <br />GRAVEL ACCESS ROAD - _ _:_CONTROL LINE. <br />f. - -- - - - _ - - ELEVATION = 5255.4 - - -- - - f/ r TO PRE - CONSTRUCTION _ _ _ _ . __ -- -_ -_ - -- -. _- _ _- _- 5250 ---- - -SEE TABLE ON THIS____...__ - -- - -- - - <br />CONDITION -- _ <br />i <br />SHEETSEC[ <br />TH=1 - - - - Ti°1 -2 <br />5250 - -- -- - -- -- - _ _ -- - - -- - -- - - <br />g - - -- sting Access Roa - 5255 --..__-' - "_ .$` <br />1 I MONUMENT TYP. = =R =12 - <br />SEE TABLE THIS SHEET X <br />ba NG GAGING <br />STATI <br />i TALL <br />RESTOREINS ' REMOVED <br />O BE <br />ERODEDPROTECTIONPERDETAILREPLACEDBYRSlSLOPE <br />RETRO IT EXISTIN <br />SPILLWAY <br />J - i /, - _ ON SHEET 7SH <br />SEE SHEET 13` , - ` ro j i <br />i t r <br />J <br />55 % Existing Reservoir' <br />1 PROPOSED i <br />PERMANENT WATE <br />SURFACE= . CE = 248 4irk „" <br />r <br />r / <br />l 1 <br />SEE SPIFFY 4 FOR <br />h A5-BUILT INFO ASSOCIATEDry <br />SQ _ h WITH DAM FMB. / f <br />rmanent Water Surface at <br />W _ 3 ime of Survey. Elevation ! / z"' <br />l' <br />arses Through The Year. I <br />RECORD DRAWING55.0 <br />R NG <br />h %; <br />I ' <br />v` <br />v July 9, 2012 t <br />THIS RECORD DRAWING HAS BEEN PREPARED, IN PART, BASED UPON <br />INFORMATION FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED ' <br />@ <br />EL•55.5 Ss Existing Concrete Spillway TO BE RELIABLE, MULLER ENGINEERING COMPANY, INC. CANNOT ASSURE ITS <br />g ; Crest Elevation = 525 1.4 '' ACCURACY, AND THUS IS NOT RESPONSIBLE FOR THE ACCURACY OF THIg <br />RECORD DRAWING OR FOR ANY ERRORS OR OMISSIONS WHICH MAY HAVE <br />I / Xr \ v <br />BEEN INCORPORATED INTO IT AS A RESULT. THOSE RELYING ON THIS RECORD `+ <br />DRAWING ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS I / <br />1 <br />ACCURACY BEFORE APPLYING IT FOR ANY PURPOSE. <br />dr <br />1 <br />f ESTORE EXISTING <br />l IGRAVELACCESSROAD Dotl <br />TO PRE - CONSTRUCTION <br />tiaCONDITION <br />o(q <br />g DESIGNED: DATE: MULLER ENGINEERING CO., INC. <br />SEO # C -1991 <br />SITE PLAN WITH SHEET <br />4 DRAWN: DATE: <br />a CHECKED: DATE: 777SOVINW"wOR GD:100 URBAN DRAINAGE AND FLOOD CONTROL DISTRICT HAVANA STREET DAM IMPROVEMENTSREVISED: DATE: W DCOLD W-4- SPILLWAY MODIFICATIONS 12 <br />REVISED: DATE: PROJECT NO. 07 -030.08 <br />F -12 <br />MONUMENT LEGEND <br />ASQ CHISELED SQUARE N: 172477.86 <br />E: 2179537.07 PROJECT DATUM: <br />Z: 5251.4 PROJECT COORDINATE SYSTEM IS BASED ON SURVEY <br />ARM4 3.75" BRASS CAP N: 172647.79 CONTROL COORDINATES FOR THE ROCKY MOUNTAIN <br />E: 2179708.04 ARSENAL AS OF OCTOBER 28, 1997. NAD 27 COLORADO <br />Z: 5254.6 NORTH ZONE, NGVD 1929. <br />ARM3 3.75" BRASS CAP N: 172702.94 <br />E: 2179898.94 <br />Z: 5254.7 <br />ASEC NO. 5 REBAR IN N: 172733.15 <br />CONCRETE MARKED "2" E: 2180172.58 <br />Z: 5253.4 <br />f' I <br />i <br />i <br />i <br />j <br />tengOverflow Channel _ 5240 ` REMOVE EXISTING 18" PIPE AND { CONTROL POINT TYP. <br />L <br />NEW 30" RC <br />STRUCTURE. <br />OUTLET <br />f ' <br />EE <br />STRUCTURE, ILTER DIAPHRAGM, I <br />TABLE THIS ET <br />DERDRAIN AND LOW __ -_ _ _ -.._'^ _ -- -----5245- RESTORE EXISTING -_ - -.. _ - - -- <br />5i545TAILWATERBASIN. SEE SHEET -DAM CREST __ _ <br />HORIZONT AL <br />GRAVEL ACCESS ROAD - _ _:_CONTROL LINE. <br />f. - -- - - - _ - - ELEVATION = 5255.4 - - -- - - f/ r TO PRE - CONSTRUCTION _ _ _ _ . __ -- -_ -_ - -- -. _- _ _- _- 5250 ---- - -SEE TABLE ON THIS____...__ - -- - -- - - <br />CONDITION -- _ <br />i <br />SHEETSEC[ <br />TH=1 - - - - Ti°1 -2 <br />5250 - -- -- - -- -- - _ _ -- - - -- - -- - - <br />g - - -- sting Access Roa - 5255 --..__-' - "_ .$` <br />1 I MONUMENT TYP. = =R =12 - <br />SEE TABLE THIS SHEET X <br />ba NG GAGING <br />STATI <br />i TALL <br />RESTOREINS ' REMOVED <br />O BE <br />ERODEDPROTECTIONPERDETAILREPLACEDBYRSlSLOPE <br />RETRO IT EXISTIN <br />SPILLWAY <br />J - i /, - _ ON SHEET 7SH <br />SEE SHEET 13` , - ` ro j i <br />i t r <br />J <br />55 % Existing Reservoir' <br />1 PROPOSED i <br />PERMANENT WATE <br />SURFACE= . CE = 248 4irk „" <br />r <br />r / <br />l 1 <br />SEE SPIFFY 4 FOR <br />h A5-BUILT INFO ASSOCIATEDry <br />SQ _ h WITH DAM FMB. / f <br />rmanent Water Surface at <br />W _ 3 ime of Survey. Elevation ! / z"' <br />l' <br />arses Through The Year. I <br />RECORD DRAWING55.0 <br />R NG <br />h %; <br />I ' <br />v` <br />v July 9, 2012 t <br />THIS RECORD DRAWING HAS BEEN PREPARED, IN PART, BASED UPON <br />INFORMATION FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED ' <br />@ <br />EL•55.5 Ss Existing Concrete Spillway TO BE RELIABLE, MULLER ENGINEERING COMPANY, INC. CANNOT ASSURE ITS <br />g ; Crest Elevation = 525 1.4 '' ACCURACY, AND THUS IS NOT RESPONSIBLE FOR THE ACCURACY OF THIg <br />RECORD DRAWING OR FOR ANY ERRORS OR OMISSIONS WHICH MAY HAVE <br />I / Xr \ v <br />BEEN INCORPORATED INTO IT AS A RESULT. THOSE RELYING ON THIS RECORD `+ <br />DRAWING ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS I / <br />1 <br />ACCURACY BEFORE APPLYING IT FOR ANY PURPOSE. <br />dr <br />1 <br />f ESTORE EXISTING <br />l IGRAVELACCESSROAD Dotl <br />TO PRE - CONSTRUCTION <br />tiaCONDITION <br />o(q <br />g DESIGNED: DATE: MULLER ENGINEERING CO., INC. <br />SEO # C -1991 <br />SITE PLAN WITH SHEET <br />4 DRAWN: DATE: <br />a CHECKED: DATE: 777SOVINW"wOR GD:100 URBAN DRAINAGE AND FLOOD CONTROL DISTRICT HAVANA STREET DAM IMPROVEMENTSREVISED: DATE: W DCOLD W-4- SPILLWAY MODIFICATIONS 12 <br />REVISED: DATE: PROJECT NO. 07 -030.08 <br />F -12