My WebLink
|
Help
|
About
|
Sign Out
Search
DWR_2731751
DWR
>
Dam Safety
>
2015
>
04
>
DWR_2731751
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 2:06:54 PM
Creation date
4/6/2015 1:05:16 PM
Metadata
Fields
Template:
Dam Safety
Document Date
12/18/2014
Document Type - Dam Safety
Report
Division
1
Dam ID
020615
Subject
HAVANA STREET DAM - SEPT. 2013 DAM FAILURE FORENSIC INVESTIGATION
DWR Send/Recipient
DAM SAFETY BRANCH - COLORADO DIVISION OF WATER RESOURCES
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
END OF CONSTRUCTION <br />HAVANA POND <br />OPERATING WATER SURFACE ON& 5248.4 <br />4 <br />CWA I I 0 <br />SF <br />340 LF <br />BMP LEGENDST, GIN G <br />NOTES: AR A <br />INSTALLED AT ACCESS <br />ED GATE NEAR HAVANA STREET (NOT SHOWN ON THESE PLANS). N CONSTRUCTION ACCESS 0 DEWATFRING 1. VEHICLE TRACKING CONTROL PAD SHALL BE <br />NOT <br />CONSTRUCTION FENCE O LIMITS OF CONSTRUCTION 2. CONTRACTOR STAGING AREA SHALL BE IN A LOCATION APPROVED <br />BY THE ROCKY MOUNTAIN ARSENAL PRIOR TO START OF 0 t1f, <br />CHECK DAM O SEEDING AND MULCHING CONSTRUCTION. STAGING AREA SHALL BE RESEEDED WITH <br />APPROVED SEED MIXTURE FOLLOWING CONSTRUCTION. 01 3ElCONCRETEWASHOUTAREA -X- O SILT FENCE 3. EXISTING ACCESS ROAD AND HAUL ROADS SHALL BE RETURNED TO <br />CF PRE-CONSTRUCTION CONDITION AT THE END OF CONSTRUCTION h1m <br />CULVERT PROTECTION SURFACE ROUGHENING 4. SEE EROSION CONTROL NOTES AND DETAILS ON SHEETS 10 AND340LF L <br />EROSION CONTROL BLANKET <br />SEO # C-1991 <br />R DESIGNED: DATE: MULLER ENGINEERING CO., INC. SHEET <br />DRAWN: DATE: CONSMING ENGINEERS <br />URBAN DRAINAGE AND FLOOD CONTROL DISTRICT HAVANA STREET DAM IMPROVEMENTS EROSION CONTROL PLANi:. CHECKED: DATE: =SOUTH WADSWORMBLVD #4-100 <br />COLORADO BnMLAKEWOOD, COLREVISED: DATE: +4 <br />REVISED: DATE: PROJECT NO. 07-030.08 ( <br />3M 988-49.39 9 of 13 <br />F-9 <br />UJLUl <br />CA <br />1 <br />It it <br />I' <br />Lu <br />Lu <br />It <br />I <br />o <br />t; <br />END OF CONSTRUCTION <br />HAVANA POND <br />OPERATING WATER SURFACE ON& 5248.4 <br />4 <br />CWA I I 0 <br />SF <br />340 LF <br />BMP LEGENDST, GIN G <br />NOTES: AR A <br />INSTALLED AT ACCESS <br />ED GATE NEAR HAVANA STREET (NOT SHOWN ON THESE PLANS). N CONSTRUCTION ACCESS 0 DEWATFRING 1. VEHICLE TRACKING CONTROL PAD SHALL BE <br />NOT <br />CONSTRUCTION FENCE O LIMITS OF CONSTRUCTION 2. CONTRACTOR STAGING AREA SHALL BE IN A LOCATION APPROVED <br />BY THE ROCKY MOUNTAIN ARSENAL PRIOR TO START OF 0 t1f, <br />CHECK DAM O SEEDING AND MULCHING CONSTRUCTION. STAGING AREA SHALL BE RESEEDED WITH <br />APPROVED SEED MIXTURE FOLLOWING CONSTRUCTION. 01 3ElCONCRETEWASHOUTAREA -X- O SILT FENCE 3. EXISTING ACCESS ROAD AND HAUL ROADS SHALL BE RETURNED TO <br />CF PRE-CONSTRUCTION CONDITION AT THE END OF CONSTRUCTION h1m <br />CULVERT PROTECTION SURFACE ROUGHENING 4. SEE EROSION CONTROL NOTES AND DETAILS ON SHEETS 10 AND340LF L <br />EROSION CONTROL BLANKET <br />SEO # C-1991 <br />R DESIGNED: DATE: MULLER ENGINEERING CO., INC. SHEET <br />DRAWN: DATE: CONSMING ENGINEERS <br />URBAN DRAINAGE AND FLOOD CONTROL DISTRICT HAVANA STREET DAM IMPROVEMENTS EROSION CONTROL PLANi:. CHECKED: DATE: =SOUTH WADSWORMBLVD #4-100 <br />COLORADO BnMLAKEWOOD, COLREVISED: DATE: +4 <br />REVISED: DATE: PROJECT NO. 07-030.08 ( <br />3M 988-49.39 9 of 13 <br />F-9
The URL can be used to link to this page
Your browser does not support the video tag.