My WebLink
|
Help
|
About
|
Sign Out
Search
DWR_2726118
DWR
>
Dam Safety
>
2015
>
03
>
DWR_2726118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2016 1:23:08 PM
Creation date
3/25/2015 9:45:01 AM
Metadata
Fields
Template:
Dam Safety
Document Date
1/23/2015
Document Type - Dam Safety
Report
Division
2
Dam ID
100469
Subject
UPPER EMERALD VALLEY RANCH DAM - FINAL DAM FAILURE FORENSIC INVESTIGATION REPORT
DWR Send/Recipient
JOHN HUNYADI, BILL McCORMICK - DSB
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
46Downstream of right abutment of UEV, part of septic leach field <br />47View across UEV breach, facing left from right side of breach. <br />48View of erosion in channel on right side of leach field <br />49View of right side of abutment of UEV, directly upstream of leach field <br />50View of right wall of UEV breach, note number of longitudinal & transverse pipes <br />51 View of right wall of UEV breach, note number of longitudinal & transverse pipes <br />52View of right wall of UEV breach, note number of longitudinal & transverse pipes <br />53View of right wall of UEV breach, note number of longitudinal & transverse pipes <br />54View of right wall of UEV breach, note number of longitudinal & transverse pipes <br />55 View of UEV basin @ upstream toe of dam <br />56View of laid down grass on downstream slope of UEV, right of breach <br />57View of UEV basin @ upstream toe of dam <br />58View of downstream side of UEV, right of breach <br />59View of outfall of transverse pipes, UEV, right of breach <br />60 View of right side of UEV breach <br />61View of right side of UEV breach <br />62View of downstream side of UEV, right of breach <br />63View of downstream side of UEV, right of breach <br />64View of downstream side of UEV, right of breach <br />65View of downstream side of UEV, right of breach <br />66 Facing upstream from D/S end of transverse pipes, right of UEV breach <br />67Facing upstream from D/S end of transverse pipes, right of UEV breach67Facing upstream from D/S end of transverse pipes, right of UEV breach <br />68 <br />Facing upstream from D/S end of transverse pipes, right of UEV breach, old low level <br />concrete box pipe <br />69Facing upstream from D/S end of transverse pipes, right of UEV breach <br />70View of Upstream side UEV, transverse pipes to right of breach <br />71View of Upstream side UEV, transverse pipes to right of breach <br />72"UEV Foundation Log" <br />73 low level concrete box pipe <br />74View of Lakeside Cabin through UEV breach <br />75Right side facing left through UEV breach <br />76Profile of right side of UEV breach from above res. Basin <br />77LEV breach, right side <br />78View of laid down grass on crest/downstream slope of LEV <br />79Profile view facing downstream of LEV breach <br />80View of erosion below 3' CMP emergency spillway on right end LEV <br />81 Crest inline with 3' CMP emergency spillway LEV <br />82inlet side of 3'CMP emergency spillway, LEV <br />83Upstream slope of remaining portion of LEV <br />84View facing downstream through 3' CMP spillway, LEV <br />85View of downstream slope of LEV, from right abutment <br />86view of erosion rills on downstream slope LEV, indicative of multiple overtopping <br />87 View of erosion below 3' CMP emergency spillway on right end LEV <br />88view of erosion rills on downstream slope LEV, indicative of multiple overtopping <br />89View of laid down grass/erosion on downstream slope LEV <br />90View of laid down grass/erosion on downstream slope LEV <br />91View of laid down grass/erosion on downstream slope LEV
The URL can be used to link to this page
Your browser does not support the video tag.