Laserfiche WebLink
CARRIAGE HILLS NO. 2 DAM, Dam Failure Forensic Investigation Report Page 25  <br />February 27, 2015  <br />  <br />  Table 6: Carriage Hills No. 2 Dam, Estimated Reservoir Stage‐Capacity Table  <br />  <br />  <br />7.4.2 Dam Embankment Geometry: For purposes of the breach analysis the Carriage Hills No. 2 Dam  <br />embankment geometry was determined from our Sept 26, 2013, breach survey.  Figure 18 shows the surveyed  <br />embankment cross‐section.     <br />  <br />  <br />Figure 18:  Carriage Hills No. 2 Dam cross‐section, as surveyed on Sept. 26, 2013.  <br />  <br />