My WebLink
|
Help
|
About
|
Sign Out
Search
DWR_4482356
DWR
>
Rulemaking
>
2025
>
08
>
DWR_4482356
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2025 7:59:03 AM
Creation date
8/8/2025 6:51:18 AM
Metadata
Fields
Template:
Rulemaking
Rule Name
Division 4 Measurement Rules
Document Date
7/31/2025
Document Type - Rulemaking
Draft, Proposed and Redlined Rules
Subject
Proposed Division 4 Measurement Rules
Year Initiated
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.1.22 "Water User," "User," or"Owner" means a Person who owns or uses a Diversion <br /> Structure, any Water Right decreed to a Diversion Structure, or any Other <br /> Structure. For the purposes of these Rules, "Water User," "User," and "Owner" <br /> may be used interchangeably. <br /> 4.2 Other Definitions. All other terms used in these Rules that are not defined in articles 82, <br /> 87, 90, and 92 of title 37 of the Colorado Revised Statutes shall be given their usual, <br /> customary, and accepted meanings. All words of a technical or legal nature specific to the <br /> administration, distribution, and regulation of Water Rights in the State of Colorado shall <br /> be given the meaning that is generally accepted within that field. <br /> Rule 5. Headgate Requirements <br /> All Diversions of surface water within the scope of these Rules shall have a Headgate, if <br /> necessary, to control the rate of Diversion. Headgates must allow the Water Commissioner, or <br /> Owner at the direction of the Water Commissioner, to accurately adjust the Diversion of water <br /> with reasonable effort and within a reasonable amount of time and to secure the Diversion <br /> Structure at the adjusted condition so as to prevent any unauthorized Diversion or adjustment. <br /> Rule 6. Measurement Methods and Recording Requirements <br /> All Diversion Structures within the scope of these Rules shall either: (1)be equipped with a <br /> Measuring Device or an Alternative Measurement Method that meets the requirements of Rule <br /> 6.1 and is approved by the Division Engineer as described in Rule 7; or(2) be declared an <br /> Inactive Diversion Structure as described in Rule 9. For any Other Structure, a Measuring Device <br /> or Alternative Measurement Method that meets the requirements of Rule 6.1 may be required by <br /> the Division Engineer and approved by the Division Engineer as described in Rule 7. All <br /> Measurement Methods must be resistant to tampering or other physical interference. <br /> 6.1 Measurement Method Functional Standards: <br /> 6.1.1 A Measuring Device or Alternative Measurement Method must measure Flow <br /> Rate, Total Volume, or other volume of water passing through a Diversion <br /> Structure or Other Structure, depending on the defining elements of a Diversion <br /> Structure's Water Right(s), the purposes for other Diversions by a Diversion <br /> Structure, or the purposes of any Other Structure. <br /> 6.1.2 For Diversion Structures or Other Structures that have or propose Flow Rates <br /> greater than 1.0 cfs, a Measuring Device or Alternative Measurement Method <br /> shall be designed to accurately measure flows to within plus or minus five percent <br /> throughout the normal operating range. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.