My WebLink
|
Help
|
About
|
Sign Out
Search
DWR_4437120
DWR
>
Rulemaking
>
2025
>
05
>
DWR_4437120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 11:03:50 AM
Creation date
5/13/2025 9:47:32 AM
Metadata
Fields
Template:
Rulemaking
Rule Name
Division 7 Measurement Rules
Document Date
4/24/2025
Document Type - Rulemaking
Final Actions
Subject
Final Judgement Confirming Resolution of All Protests to the Proposed Rules
Date Effective
6/1/2025
Year Initiated
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.1.4 "Diversion Structure" means a Control Structure, ditch, canal, flume, reservoir, <br /> bypass, pipeline, conduit, well, pump, or other structure or device designed to <br /> Divert water from its natural water course or location or control water in its <br /> natural course or location. <br /> 4.1.5 "Flow Rate" means instantaneous flow, usually expressed in gallons per minute <br /> ("gpm") or cubic feet per second ("cfs") <br /> 4.1.6 "Groundwater" means any water not visible on the surface of the ground under <br /> natural conditions, as defined in section 37-90-103(19), C.R.S. <br /> 4.1.7 "Headgate" means a structure sufficient to control the rate of Diversion of water <br /> at all ordinary stages, as more fully described in section 37-84-112(1), C.R.S. <br /> 4.1.8 "Inactive Diversion Structure" means a Diversion Structure for which a Water <br /> User files an affidavit, on a form prescribed by the State Engineer, with the <br /> Division Engineer declaring the Water User's intent to not use the Diversion <br /> Structure for any Diversion or water application purpose, as more fully described <br /> in Rule 9 <br /> 4.1.9 "Measuring Device" means a Measurement Method that is a permanently- <br /> installed device, such as a flume, weir, staff gage associated with a stage-storage <br /> curve, or totalizing flow meter, including a totalizing flow meter that may be <br /> removed in the winter when the structure is not in use, used to directly determine <br /> the Flow Rate, Total Volume, or volume of water diverted, stored in a Reservoir, <br /> released from a Reservoir, or delivered for any purpose within the standards of <br /> accuracy identified in these Rules. <br /> 4.1.10 "Measurement Method" means a method used to determine the Flow Rate, Total <br /> Volume, or volume of water diverted, stored in a Reservoir, released from a <br /> Reservoir, or otherwise delivered for any purpose within the standards of <br /> accuracy identified in these Rules, and includes Measuring Devices and <br /> Alternative Measurement Methods. <br /> 4.1.11 "Notice," "Notify," or"Notification" to the Division Engineer means submission <br /> of a written message to the Division Engineer by mail or email, or the submission <br /> of a completed form or other format prescribed by the State Engineer where <br /> specifically required by these Rules. <br /> 4.1.12 "On-Stream Reservoir" means a Reservoir that is located on a natural stream. <br /> 4.1.13 "Off-Stream Reservoir" means a Reservoir that is located such that a natural <br /> stream does not flow through the Reservoir and the Reservoir fills by diverting <br /> 4 <br /> EXHIBIT A <br />
The URL can be used to link to this page
Your browser does not support the video tag.