My WebLink
|
Help
|
About
|
Sign Out
Search
DWR_4437120
DWR
>
Rulemaking
>
2025
>
05
>
DWR_4437120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 11:03:50 AM
Creation date
5/13/2025 9:47:32 AM
Metadata
Fields
Template:
Rulemaking
Rule Name
Division 7 Measurement Rules
Document Date
4/24/2025
Document Type - Rulemaking
Final Actions
Subject
Final Judgement Confirming Resolution of All Protests to the Proposed Rules
Date Effective
6/1/2025
Year Initiated
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.2 For the purpose of obtaining approval of the use of a Measurement Method, and in <br /> compliance with the timelines described in the phase in provisions of Rule 16, the Water <br /> User seeking to use a newly installed, reinstalled, or changed Measurement Method shall <br /> provide Notice to the Division Engineer or the Division Engineer's delegate that includes <br /> the following information: (1)Person's name, (2)Diversion Structure or Other Structure <br /> name, (3) decree case number(if applicable), (4)legal description (PLSS quarter-quarter, <br /> section, township and range or UTM coordinates) of the Diversion or Other Structure, (5) <br /> Measuring Device installed, (6)rating table for Measuring Device (if non-standard), <br /> and/or a stage-capacity table in the case of a Reservoir, and (7)the date of installation. <br /> 7.3 To obtain approval of a Measuring Device, the Water User must provide evidence that <br /> the Measuring Device is properly rated and properly installed, as described in Rule 6.1. <br /> 7.4 To obtain approval of an Alternative Measurement Method, the Water User must provide <br /> the basis for the use of an Alternative Measurement Method,including, but not limited to, <br /> any and all assumptions, field conditions, and calculations, to the satisfaction of the <br /> Division Engineer, as described in Rule 6.1.7, to ensure that the Division Engineer can <br /> accurately determine that the Alternative Measurement Method will operate according to <br /> the accuracy standards identified in these Rules. <br /> Rule 8. Data Recording and Data Submission <br /> The Division Engineer has the authority to require the Water User to record and report at <br /> reasonable times the data for Diversions by any Diversion Structure or for measurement for <br /> Other Structures subject to these Rules. Diversion data will be recorded by the Water <br /> Commissioner, Water User, or both as determined by the Division Engineer, in cooperation with <br /> the Water User. <br /> Rule 9. Inactive Diversion Structures <br /> Inactive Diversion Structures are excluded from these Rules provided that the Water User files <br /> an affidavit, on a form prescribed by the State Engineer, with the Division Engineer declaring the <br /> Water User's intent to not use the Diversion Structure for any Diversion or water application <br /> purpose. Once an Inactive Diversion Structure affidavit is filed with the Division Engineer, no <br /> further filings are required under these Rules unless the Water User wishes to change the <br /> Diversion Structure from inactive status to active status. When a Water User desires to change <br /> an Inactive Diversion Structure to active status, written Notification from the Water User to the <br /> Division Engineer is required prior to activation. A Diversion Structure listed as inactive under <br /> this Rule 9 shall not be used until such Notification is given and the Diversion Structure and <br /> associated Measurement Method are determined by the Division Engineer to be in compliance <br /> with these Rules. <br /> 10 <br /> EXHIBIT A <br />
The URL can be used to link to this page
Your browser does not support the video tag.