Laserfiche WebLink
BOE Stipulated Settlement Guide <br /> May 23, 2024 <br /> page 2 <br /> Hole/Well Construction, Cistern Installation, Pump Installation, and Hole/Well <br /> Abandonment Violations <br /> Repeat violations will be calculated as the product of the violation penalty times the number <br /> of same (or similar) violations within a four year period ($1,000 max) <br /> Insufficient Annular Space for Grout $600 <br /> Insufficient Grout Interval $600 <br /> Insufficient Depth of Steel Casing $600 <br /> Use of Unapproved Grout Material in Required Grout Interval $600 <br /> Failure to Obtain a Variance Approval Prior to Construction $600 <br /> Failure to Isolate Type 3 Aquifer Materials from Underlying $600 <br /> Consolidated Bedrock Aquifer Materials <br /> Other Rule (2 CCR 402-2) Violations $500 <br /> Other Statute or Rule Violations <br /> Repeat violations will be calculated as the product of the violation penalty times the number <br /> of same (or similar) violations within a four year period ($1,000 max) <br /> Allow the Unauthorized Use of a License $1,000 <br /> Deliberate Obstruction of the Well Inspection Process $500 <br /> Failure to Notify Board of Changes in Company or Employee $300 <br /> Information <br />