My WebLink
|
Help
|
About
|
Sign Out
Search
DWR_4151840
DWR
>
Publications and Reports
>
2023
>
10
>
DWR_4151840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2023 12:08:06 PM
Creation date
10/19/2023 11:45:16 AM
Metadata
Fields
Template:
Publications and Reports
Title
NOVEMBER 1996 SWSI: COLORADO WATER SUPPLY CONDITIONS UPDATE, SURFACE WATER SUPPLY INDEX
Year
1996
Document Type - Publications and Reports
SWSI Monthly Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO BASIN <br /> asinwide Conditions Assessment: <br /> The SWSI value of 1.9 indicates that for October the COLORADO RIVER BASIN <br /> basin water supplies were above normal. Flow at the gaging 6 Surface deter Supply Index History <br /> station Colorado River near Dotsero averaged 1,344 cfs as ,- <br /> compared to the long term average of 1,295 cfs. Storage in 3- <br /> Green Mountain, Ruedi, and Williams Fork reservoirs totaled ' <br /> 107% of normal as of the end of October. 2- , u i <br /> 5 ,_ , - , ONO_ <br /> i u 0 i ,I v ii i ie '1 <br /> Outlook I. li" civil�'i ' i�ii i {' <br /> Currently there is no call on the Colorado River _, I o, w e k i i 0 4 <br /> mainstem. It is anticipated that Shoshone Power Plant will . 'I ) 44/ 1 <br /> -2- I, <br /> place its 1,250 cfs right (12-5-1905) on call once the <br /> scheduled maintenance program is complete, and keep it on 3- <br /> throughout the winter _, ' <br /> JANE, JAN99 JAN419 JAN90 .JA1A1 JAN92 JAN93 JAN94 JANOS JAN96 <br /> MONTW YEAR <br /> Administrative/Management Concerns <br /> The Colorado Water Conservation Board has requested <br /> that its winter in-stream flow right within the middle segment <br /> of Snowmass Creek be administered as 12 cfs in October, 10 <br /> cfs from November 1 through December 14, 9 cfs from COLORADO RIVER NR. DOTSERO <br /> December 15 through December 31, and 10 cfs during 130 FIRST MONTH OF THE WATER YEAR <br /> January, February, and March. This request is a result of the 120 7,/, <br /> 110 <br /> best available data adjusted for diversions on East Snowmass <br /> 100 <br /> Creek in excess of 2 cfs. <br /> Y <br /> 90 <br /> Y1 S0 / ' <br /> Public Use Impacts . <br /> Snow making at Summit County ski areas began in 5 F 6D <br /> early October. Effects of these snow making diversions on V o <br /> V . <br /> minimum stream flows will be monitored at Breckenridge by <br /> 30 <br /> a new satellite gage station installed in late September,and at4 <br /> 20 <br /> Keystone by a satellite station anticipated to be installed in 10 <br /> late November. <br /> OCTOBER 1996 OCT.AVG. ('61-'95) HIGH(1963) LOAM C1993) <br /> Representative Reservoirs <br /> Colorado Myer Basin <br /> 120 <br /> 110 <br /> 100 f{{/ <br /> 90 <br /> I' 60 / l` <br /> sD r <br /> gt, >//\ . <br /> 30 <br /> 20 <br /> 10 fI \ // \\ //\\ <br /> Green Mountain Ru.dl Wi ll.ne Fort <br /> ® Avg 10131 Content. ® 10/31/16 Context* <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.