My WebLink
|
Help
|
About
|
Sign Out
Search
DWR_4148979
DWR
>
Rulemaking
>
2023
>
10
>
DWR_4148979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2025 11:51:03 AM
Creation date
10/17/2023 9:12:29 AM
Metadata
Fields
Template:
Rulemaking
Rule Name
Water Well Construction Rules (2CCR-402-2)
Document Date
10/17/2023
Document Type - Rulemaking
Draft, Proposed and Redlined Rules
Subject
October 2023 Draft Proposed Rules/Redline
Date Effective
1/1/2026
Year Initiated
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
by the Board upon presentation and approval of qualifications. "Professional geologist" is <br /> defined in section 23-41-208(b), C.R.S. as "a person engaged in the practice of geology who is <br /> a graduate of an institution of higher education which is accredited by a regional or national <br /> accrediting agency, with a minimum of thirty semester(forty-five quarter) hours of <br /> undergraduate or graduate work in a field of geology and whose post baccalaureate training <br /> has been in the field of geology with a specific record of an additional five years of geological <br /> experience to include no more than two years of graduate work." <br /> 5.2.5 5.2.4 "Bedrock" means consolidated crystalline or sedimentary rock. <br /> 5.2.5 <br /> 5.2.6 "Board" means the state Board of Examiners of Water Well Construction and Pump <br /> Installation Contractors created by section 37-91-103. § 37-91-102(3), C.R.S. <br /> 5.2.6 <br /> 5.2.7 "Borehole" means a cylindrical excavation that is augered, drilled, bored, cored, washed, <br /> fractured, driven, dug,jetted, or otherwise constructed to access the subsurface for the <br /> purpose of constructing a hole or well under the jurisdiction of these Rules. <br /> 5.2.7 <br /> 5.2.8 "Casing" means the pipe installed to prevent collapse of and provide access to the borehole. <br /> The term includes both nonperforated ("solid") pipe, perforated pipe, liner, and screen. <br /> 5.2.8 <br /> 5.2.8.1 "Temporary Surface Casing" is the outermost, temporary string of casing used to <br /> hold back zones of shallow, unconsolidated or unstable materials from the borehole <br /> to facilitate drilling and placement of other strings of casing. Temporary surface <br /> casinq may be PVC or steel and is differentiated from Surface Casing or Production <br /> Casing in that it is not considered a permanent part of the well construction, should be <br /> removed prior to completing grouting in any required grouted intervals and thus not <br /> documented on the well construction report. <br /> 5.2.8.2 "Surface Casing" is a string of nonperforated, steel casing typically set to isolate or <br /> protect the borehole and other subsequent strings of casing from shallow <br /> unconsolidated or unstable materials, though surface casing may extend to significant <br /> depths. <br /> 5.2.8.3 "Production Casing" is a string of casing that is set through the production zone. The <br /> production casing may extend to the ground surface and be the only casing string if no <br /> surface casing is used or may be a liner that extends up and into the surface casing <br /> but not necessarily to the ground surface. Production casing can be nonperforated, <br /> perforated, PVC or steel casing depending on its position within the well and the <br /> Aquifer type. <br /> 5.2.9 "Centralizer" means a device attached to the outside of casing for the purpose of centering it <br /> within a borehole or outer casing.- in a minimum of three equidistant planes (e.g., minimum 1 <br /> centralizing arm every 120 degrees around the casing; additional planes of centralization <br /> encouraged). <br /> 5.2.10 5.2.9 "Cistern" means an enclosed, unpressurized reservoir or tank for storing water as <br /> part of a water well supply system. <br /> 5.2.10 <br /> 5.2.11 "Completion of pump installation" means that the production equipment has been installed <br /> in a well, all necessary equipment has been connected, the well has been disinfected, the <br /> production equipment has been tested, and the well is ready to be placed into service. <br /> 5.2.11 <br /> 5.2.12 "Completion of well construction" means that the well has been cased,developed,tested for <br /> yield, cleaned, disinfected, and is ready for the installation of the production equipment. <br /> 5.2.12 <br /> 5.2.13 "Confining layerunit" means a geologic zone that, because formation, group of its <br /> impermeabilityformations, or low permeability,part of a formation that separates dor <br /> inhibits the flow of groundwater into, out of, or between distinct or administratively-defined <br /> aquifers (aquifers identified in permits issued by the State Engineer).because it is <br /> impermeable or distinctly less permeable than adjacent hydrogeologic units. Some confining <br />
The URL can be used to link to this page
Your browser does not support the video tag.