My WebLink
|
Help
|
About
|
Sign Out
Search
DWR_4148979
DWR
>
Rulemaking
>
2023
>
10
>
DWR_4148979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2025 11:51:03 AM
Creation date
10/17/2023 9:12:29 AM
Metadata
Fields
Template:
Rulemaking
Rule Name
Water Well Construction Rules (2CCR-402-2)
Document Date
10/17/2023
Document Type - Rulemaking
Draft, Proposed and Redlined Rules
Subject
October 2023 Draft Proposed Rules/Redline
Date Effective
1/1/2026
Year Initiated
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
casing. <br /> d. Centralization of the casing at the ground surface may be accomplished with <br /> appurtenances of the drilling equipment or other mechanical means. <br /> e. Centralizers must be installed in all grouted intervals of the surface casing and <br /> production casing of a well. The distance between centralizers must not exceed fifty <br /> (50) feet for intervals that will be grouted for more than fifty (50) feet. <br /> f. If the grouted interval of the won casing is less than fifty (50) feet, centralizers <br /> must be installed atwithin 5 feet of the top and bottom of the grouted interval. <br /> q. Production casing must be hung in tension during the placement of grout <br /> material. <br /> 10.4.2 Wells with Surface Casing -Wells that will be constructed with a surface casing <br /> string must have watertight steel casing and joints installed from a minimum of one (1) <br /> foot above to a minimum of nineteen (19) feet below ground level. The annular space <br /> between the borehole wall and surface casing string must, at a minimum, be grouted in <br /> accordance with the requirements of Rule 10.5. Centralizers must also be installed <br /> on grouted surface casing within five (5) feet of the bottom of the surface <br /> casing. <br /> 10.4.2.1 Driven Surface Casing for wells in Type 41 nd Type Ill guife.-&- <br /> The annular space between surface casing that is driven and the production <br /> casing string must be grouted in accordance with the following requirements for <br /> Type 142 and Type 1-443 aquifers. Additional grouting below the base of the driven <br /> surface casing may be necessary to comply with the requirements for a <br /> particular type of aquifer.Type 1 or Confined San Luis Valley aquifers. See <br /> Figure 3. <br /> a. For Type 1, 2, and Confined San Luis Valley aquifers (unconfined <br /> bedrock aquifers) with driven surface casing, the grout interval must <br /> extend from at least twenty (20) feet below to at least ten (10) feet <br /> above the base of the surface casing. <br /> b. For Type 41-43 aquifers (unconsolidated aquifers)with driven surface <br /> casing, the grout interval must extend from at least ten (10) feet below to <br /> at least ten (10) feet above the base of the surface casing. See Figure 3. <br /> 10.4.3 Wells without Surface Casing -All wells that will be constructed without surface casing <br /> must have watertight steel casing and joints installed from a minimum of one (1) foot <br /> above to a minimum of nineteen (19) feet below ground level. The annular space <br /> between the borehole wall and production casing string must be grouted in accordance <br /> with grouting requirements for the particular type of aquifer in which the well is <br /> constructed and the requirements of Rule 10.5.2.1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.