Laserfiche WebLink
9.2.1 Required Notice- Test holes that penetrate a confining layerunit between two <br /> distinct aquifers, monitoring and observation holes and wells, and dewatering wells <br /> must be constructed pursuant to the Notice of Intent requirements stated in Rule <br /> 6.3. <br /> 9.2.2 Reporting Requirements -A Well Construction and Test Report must be submitted in <br /> accordance with the provisions of Rule 17 for each monitoring and observation hole <br /> constructed.A well construction report is not required for the construction of a <br /> dewatering well unless the well is permitted as a dewatering system. <br /> 9.3 Construction Standards The excavations authorized under this Rule 9 must be constructed in <br /> accordance with the applicable Rules specified for such structure. Where construction standards <br /> for an excavation authorized by this Rule 9 are not specified in these Rules, the construction of <br /> the excavation must comply with the construction and grouting standards and Rules applicable <br /> to water wells; (Rule 10), unless a variance from those Rules is obtained pursuant to Rule 18. <br /> 9.3.1 Monitoring and observation holes and wells, and test holes that do not penetrate through <br /> a confining layerunit between two distinct aquifers must be constructed in accordance <br /> with the provisions of Rule 14. <br /> 9.3.2 Dewatering wells and dewatering systems that} <br /> a. do not penetrate through a confining la-yerunit between two distinct aquifers <br /> and (2) <br /> b. are not constructed in a vertical borehole; <br /> must be constructed in accordance with all applicable municipal, county, state, and <br /> federal regulations and standards. No other minimum construction standards apply for <br /> such wells or holes, except that the well or hole must be constructed to prevent <br /> contamination of surface or groundwater. Such wells must be abandoned pursuant to <br /> the provisions of Rule 16.4.1. <br /> 9.3.3 Dewatering systems (excluding drains and sumps) constructed as wells must be <br /> constructed in accordance with the construction and grouting requirements of Rule 10 if: <br /> a. the system penetrates through a confining unit between two distinct aquifers <br /> or <br /> b. the system is constructed in a vertical borehole similar to a water well <br /> 9.3.4 Pond or lake wells (including gravel pit wells) permitted pursuant to sections 37-90-107 <br /> or 37-90-137, C.R.S. are exempt from the provisions of these minimum construction and <br /> location standards, except that the owner must ensure that the pond or lake well is <br /> constructed in such a manner as to prevent contaminants from entering the pond or lake <br /> well. A report documenting construction of a pond or lake well must be submitted upon <br /> completion of the well, as required by Rule 17.1.5. <br /> 9.4 If during construction of an excavation authorized by this Rule 9, the borehole penetrates through <br /> a confining layerunit into a lower aquifer, the hole must be plugged back through the confining <br /> layerunit with at least twenty (20) feet of cement or cement-bentonite grout or through the entire <br /> confining tayerunit, whichever is greater, or the hole must be plugged, sealed and abandoned <br /> pursuant to Rule 16 within twenty-four(24) hours. <br /> 9.5 Plugging, Sealing and Abandonment- Excavations authorized by this Rule 9 shall be <br /> plugged, sealed and abandoned according to the provisions of Rule 16. <br /> 9.6 Conversion to Water Wells Prohibited -A monitoring and observation hole, dewatering <br /> well, and other excavation constructed pursuant to a Notice of Intent form provided to the <br /> State Engineer, as provided in Rule 6.3 and this Rule 9, may not be converted to a production <br /> water well for beneficial use. A monitoring and observation hole or dewatering well <br />