My WebLink
|
Help
|
About
|
Sign Out
Home
Search
DWR_3992986
DWR
>
Rulemaking
>
2022
>
11
>
DWR_3992986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2024 3:36:39 PM
Creation date
11/4/2022 9:52:18 AM
Metadata
Fields
Template:
Rulemaking
Rule Name
Division 6 Measurement Rules
Document Type - Rulemaking
Final Actions
Subject
State Engineer's Statement of Basis and Purpose for Rules and Regulations Governing Measurement of Surface Water and Groundwater Diversions and Storage, Release and Delivery of Water Located in Water Division 6
Date Effective
1/16/2024
Year Initiated
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE ENGINEER'S STATEMENT OF BASIS AND PURPOSE FOR RULES AND REGULATIONS <br /> GOVERNING THE MEASUREMENT OF SURFACE WATER AND GROUNDWATER DIVERSIONS AND <br /> STORAGE,RELEASE,AND DELIVERY OF WATER 149CVETflitly"got 1NV!IN3u11 PM <br /> FILING ID: 464D865B9EFC4 <br /> This Statement of Basis and Purpose has been pre$ t6VM b te'Qi n a i larify the <br /> reason for and intent of the Rules and Regulations Governing the Measurement of Surface Water <br /> and Groundwater Diversions and Storage of Water Located in Division 6 ("Division 6 <br /> Measurement Rules" or"Rules"). The purpose of the Rules generally is to establish consistent <br /> and reliable standards to assist the State Engineer and Division Engineer for Water Division 6 in <br /> the administration, distribution, and regulation of the waters of the state in Water Division 6. <br /> Capitalized terms used in this Statement of Basis and Purpose take the meanings assigned to <br /> them in the Rules. <br /> I. Purpose <br /> Historically, the Division Engineer for Water Division 6 would issue individual orders <br /> for the installation or repair of Headgates and Measuring Devices for any Diversions without <br /> existing or workable Headgates or Measuring Devices when a stream system became subject to <br /> an administrative call or when the Diversion was identified as a key administration point. The <br /> need for administrative calls in Water Division 6 has increased in recent decades due to reduced <br /> water supplies caused by drought conditions and increased demands for new water uses and <br /> rights. In many areas, Water Division 6 has experienced multiple years where unprecedented <br /> administrative calls occurred, highlighting the tightening of supplies and increased competition <br /> for the limited water resource. These circumstances have resulted in new and complex water <br /> court decrees, augmentation plans, exchanges, reservoir operations, and determinations of <br /> additional areas where enhanced water administration is required. More robust measurement of <br /> Diversions is needed to ensure that water is optimally delivered and used by Owners and Users <br /> of vested water rights in Water Division 6. The Rules are therefore necessary to respond to the <br /> needs of the Water Users and the Division Engineer under these circumstances. <br /> II. Authority for Proposed Rulemaking <br /> A. Statutory Authority for the Installation of Headgates and Measuring Devices <br /> The Colorado Revised Statutes set forth responsibilities of Water Users and Owners in <br /> article 84 of title 37. Sections 37-84-112 through-117, C.R.S., establish certain responsibilities <br /> related to the installation of Headgates and Measuring Devices, including the installation of gage <br /> rods and capacity tables associated with water storage structures, where necessary, in connection <br /> with taking water from any stream or controlling water at all ordinary stages. The State Engineer <br /> is authorized to order any Owner or User of a water right to install and maintain, at such owner's <br /> or user's expense, necessary meters, gages, or other measuring devices and to report at <br /> reasonable times to the appropriate Division Engineer the readings of such meters, gages, or <br /> other measuring devices,pursuant to section 37-92-502(5)(a), C.R.S. In addition, section 37-92- <br /> 502(5)(b), C.R.S., authorizes the State Engineer to order any person or company supplying <br /> energy used to pump groundwater to provide, at reasonable times to the appropriate <br /> Division Engineer, records of energy used to pump groundwater. However, this statutory section <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.