My WebLink
|
Help
|
About
|
Sign Out
Search
DWR_3825127
DWR
>
Guidance Documents
>
2021
>
10
>
DWR_3825127
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2021 12:42:40 PM
Creation date
10/7/2021 12:38:43 PM
Metadata
Fields
Template:
Guidance Documents
Document Type - Guidance Documents
Protocol
Topic
Water Administration
Title
Division 1 - REVOKED South Platte River Administrative Protocol: Recharge
Document Date
10/1/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REVOKED 10/1/2020 <br /> ADMINISTRATION PROTOCOL <br /> Recharge <br /> Division One - South Platte River <br /> The purpose of a "recharge structure" as referenced in this document is to introduce <br /> water to the river alluvium that will result in accretions to a live stream. For the purposes <br /> of this document, a recharge structure does not include a well that is used to artificially <br /> recharge a Denver Basin bedrock aquifer. With that qualification, a recharge structure is <br /> defined as: <br /> A section of ditch, the losses from which can be reasonably modeled as a <br /> single source of water. <br /> A pond or group of ponds that receive water from the same delivery location <br /> and can be reasonably modeled as a single source of water. <br /> 1. A written notification for each recharge structure must be provided to the water <br /> commissioner and division engineer. The Division of esources will <br /> not acknowledge any recharge activity conduct wit the knowledge of <br /> the water commissioner. The notification must in u <br /> a. a map showing the location of the struc a th case number of <br /> the plan for augmentation authorize t e st c ure; <br /> b. a map showing the location of the di rsio and the court case <br /> number for the decree authoriz' t if any; <br /> c. a map showing the locati formation for the metering <br /> location; <br /> d. the maximum water s a area the structure; <br /> e. for ditch structur s, if t ditc is divided into more than one recharge <br /> reach, an a how the volume diverted will be allocated to the <br /> 50 <br /> various se ns. <br /> 2. Upon receivin otif' tion or decree by the water court, the division <br /> engineerw' n cture a WDID number. The WDID number is the <br /> identific n n er t will be used for the administration of the structure and <br /> must be i correspondence and accounting reports. (For structures <br /> that were in ded in a decreed plan for augmentation but were not <br /> physically con ructed at the time of the decree, a written notification of the <br /> intent to construct the structure must be provided.) <br /> 3. Any structure that intercepts groundwater must be permitted as a well and <br /> included in a plan for augmentation or substitute water supply plan approved by <br /> the state engineer. The division engineer strongly recommends avoiding <br /> recharge structures that intercept groundwater, in order to simplify the accounting <br /> process. <br /> 4. The flow into EVERY recharge structure MUST be metered and equipped with a <br /> continuous flow recorder unless the water commissioner in conjunction with the <br /> division engineer determines adequate records may be kept without such <br /> equipment. If the recharge structure is designed to discharge water via a surface <br /> outlet, such discharge must also be metered and equipped with a continuous <br /> flow recorder. The water commissioner MUST approve the use of the recharge <br /> structure BEFORE any credit will be given for water placed into recharge. <br /> Administration Protocol - Recharge <br /> Revised February 1, 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.