Laserfiche WebLink
Page 3of4 <br /> maybe a formal approval,denial,or approval with terms and conditions. It may also be a request <br /> for more information <br /> i) If more information is requested from the applicant,the applicant has 90 days to provide it to <br /> the Division Engineer <br /> ii) The Division Engineer shall then render a decision within 90 days of receipt of said information <br /> O Once an approval has been granted for a Rule 8 application,no further application is required <br /> unless the applicant wishes tomodify or replace the improvement or alter the terms and <br /> conditions nf the approval. <br /> o) The Division Engineer may adjust terms and conditions of a Rule 8 approval within three years <br /> after approval. After the three year period,adjustments may only be made to comply with a final <br /> court order pursuant Rule 9.C. <br /> 4) Rmlm10 Compact Compliance Plan submittals: <br /> al Applications under Rule 10 Compact Compliance Plans (Plans) may include water other than the <br /> subject water right as defined in Rule 5 of the Irrigation Improvement Rules for use in maintaining <br /> historic seepage and return flows. The Applicant may propose terms and conditions toprevent <br /> violation nf Article IV-Dof the Compact. <br /> bl Rule 10 Plan applications submitted tnthe Division Engineer must contain: <br /> D Name and contact information of the owner/user <br /> iD Detailed description of the subject iznprnverucnt(s) <br /> iiil Detailed description of the lands irrigated by the proposed improvement to include location, <br /> size and current ooetbod(n) of irrigation used ou this acreage <br /> iv) Detailed description of all subject water rights to include water right name for direct flow <br /> rights and water right name and storage location for stored subject water rights <br /> vl Detailed description of all proposed imported/fully consumable waters including place of <br /> storage,pniut(o) nf delivery and terms ofuse <br /> vD ISAM Model run data representing both pre and post improvement conditions for each <br /> improvement <br /> viil Model run data for lagged impacts from the Ground Water Accounting Model,Analytical <br /> Stream Depletion Factor (Clover) Model n,IDS AWASModel <br /> viiD Signature of irrigation system owner nr their designated agent <br /> cl The Division Engineer shall provide notice of all Rule 10 Plan applications and exhibits to the <br /> Notification List <br /> dl Within 90 days of receipt of application,the Division Engineer vviUrenderadccisino. This decision <br /> maybe a formal approval,denial,or approval with terms and conditions. lt may also bearequest <br /> for more information <br /> D If more information is requested from the applicant,the applicant has 90 days to provide itto <br /> the Division Engineer <br /> iD The Division Engineer shall then render a decision within 90 days of receipt of said information <br /> el Rule 10 Compact Compliance Plans require annual review and approval unless the Division <br /> Engineer determines that u longer approval period isappropriate <br /> D An annual accounting of estimated operations of the Plan considering the lagged impacts of any <br /> prior plan years shall be submitted to the Division Engineer <br /> (1) The accounting report shall include: <br /> (u) The change in historical seepage losses and return flows by month from each <br /> improvement under the Plan at the structure level (farm, ditch or lateral) as well as the <br /> lagged impact of the seepage losses and return flows due to the improvements in <br /> aggregate by month and stream reach. <br /> (b) The amount,time and location of all water projected to be provided under the Plan to <br /> maintain historical seepage losses and return flows <br /> [c) The projected monthly operations under the Plan for the application year incorporating <br />