My WebLink
|
Help
|
About
|
Sign Out
Home
Search
DWR_3526798
DWR
>
State Engineer Filing
>
2019
>
11
>
DWR_3526798
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 4:38:42 PM
Creation date
11/8/2019 12:01:23 PM
Metadata
Fields
Template:
State Engineer Filing
Document Date
4/7/2020
Document Type - State Engineer Filing
Correspondence
Subject
Rainwater Harvesting Legal Framework
DWR Send/Recipient
Tracy Kosloff
Outside Send/Recipient
Mark Mitisek
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rainwater Harvesting Legal Framework <br />Page 4 <br />5. After the required two years of data collection, operate pilot project pursuant to an <br />SWSP' or augmentation plan without a need to replace the historic natural depletion. <br />Any water stored in excess of historic natural depletion must be augmented. Sponsor <br />may first apply to the water court for an augmentation plan and a 308(4) SWSP (option <br />a) or operate pursuant to a 308(5) SWSP without a court application (option b). After <br />operating under a 308(5) SWSP, an applicant may file an augmentation plan <br />application in water court and then operate pursuant to a 308(4) SWSP prior to <br />obtaining a decree (i.e. transition from Option b to Option a). <br />Option a - File Application in Water Court <br />Option b - No Water Court Application <br />File augmentation plan application in water <br />Apply for and operate under 37-92-308(5) <br />court. <br />SWSPs approved annually for no more than 5 <br />natural depletion. <br />years.' <br />Apply for and operate under 37-92-308(4) <br />SWSPs approved annually. <br />6. The pilot project will either operate permanently pursuant to an augmentation plan <br />decree or cease operation as shown below: <br />Option a - Obtain Court Decree >t Operate <br />Option b - Cease Operation <br />Operate project pursuant to Court Decree <br />As described in 115(6)(c)(II)(A), Applicants <br />without a need to replace the historic <br />must apply to and obtain approval from the <br />natural depletion. <br />state engineer to permanently retire the <br />rainwater collection system. The state <br />engineer will require replacement of ongoing <br />delayed depletions. <br />7. Submit a final report to the CWCB board and the state engineer by January 15, 2025, <br />as required by section 37-60-115(6)(d). <br />5 The standard guidance for applying for an SWSP is Suggestions on Submittals of SWSP Requests and <br />Comments (12/20/2017) and Policy 2003-2: Implementation of Section 37-92-308, C.R.S. (2003) <br />Regarding Substitute Water Supply Plans. Additional information about SWSP requirements for <br />rainwater harvesting is included in Section C of this memo. <br />6 37-92-308(5)(a) states, "the depletions associated with such water use plan or change will be for a <br />limited duration not to exceed five years". Similar to the pumping of a well, the capture of <br />precipitation that historically would have accrued to the stream slowly through the groundwater <br />creates a lagged depletion. Therefore, the operation of a precipitation harvesting project may create <br />depletions that lag for several years. If the lagged impact of operating the project exceeds five years, <br />it is not possible to operate pursuant to a 308(5) SWSP except pursuant to the limited exception <br />described in 308(5)(b)(II), where a precipitation harvesting pilot project sponsor "may request renewal <br />of a plan that would extend the plan past five years from the initial date of approval if the project <br />sponsor demonstrates to the state engineer that an additional year of operation under the plan is <br />necessary to obtain sufficient data to meet the Colorado water conservation board's criteria for <br />evaluating the pilot project or an application for a permanent augmentation plan is pending before the <br />water court." <br />
The URL can be used to link to this page
Your browser does not support the video tag.