My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-06_REVISION - C1996083 (6)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2013-09-06_REVISION - C1996083 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:24:51 PM
Creation date
9/6/2013 9:30:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
9/6/2013
Doc Name
Letter & Application
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
MR139
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7T" STREEET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX: (970) 242 -7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />September 3, 2013 <br />Susan Burgmaier <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine <br />MR -139, Interim Plan for waste disposal at gob pile #3 <br />Permit C- 1996 -083 <br />Dear Ms. Burgmaier: <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />wovft <br />RECEIVED <br />SEP 0 6 2013 <br />MINING AND RECLAMATI <br />On behalf of Bowie Resources, LLC, enclosed is an application for a minor revision to delineate <br />where gob will be placed at gob pile #3. <br />Construction of the coal mine waste pile will be a phased project with placement of gob <br />starting on the western edge of the pile, and progressing eastward. The majority of the gob <br />footprint has been cleared of all organic material and topsoil <br />Until the underdrain as submitted under Technical Revision No. 81 is approved, Bowie will be <br />limited to placement of gob in the western most pit bounded by ditches J -8 -1 & 2 and a haul <br />road. While gob is being placed in the west pit, Bowie will continue coverfill salvaging efforts, <br />with coverfill to be placed either in stockpile, for use at gob pile #2, or used for <br />contemporaneous reclamation efforts at gob pile #3. There is an area where topsoil still needs <br />to be salvaged and is shown on the attached figure. <br />Please let me know if you have any questions. Thanks. <br />Sincerely, <br />v <br />Tamme Bishop, P.E. <br />Project Engineer <br />Cc: Bill Bear <br />
The URL can be used to link to this page
Your browser does not support the video tag.