My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-27_REVISION - C1981022
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2013-08-27_REVISION - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:24:25 PM
Creation date
8/28/2013 12:22:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Revision
Doc Date
8/27/2013
Doc Name
SEDCAD Review
From
Brock Bowles
To
Susan Burgmaier
Type & Sequence
RN6
Email Name
SLB
SB1
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/28/13 State.co.us Eecutive Branch Mail - Re: Elk CreekSEDCAD reuiewC1981022 RN 6 <br />Burgmaier - DNR, Susan <susan.burgmaier @state.co.us> Wed, Aug 28, 2013 at 11:28 AM <br />To: "Bowles - DNR, Brock" <brock.bowles @state.co.us> <br />Cc: Sandy Brown - DNR <sandy.brown @state.co.us >, Alysha Hernandez - DNR <alysha.hernandez @state.co.us> <br />Brock - I have one adequacy comment for this renewal response: <br />Section 6 of Exhibit 2.05 -E3 includes a Pond D Summary that lists the details of the currently approved <br />Pond D configuration. The primary spillway invert elevation on this table is reported to be 6166.0'. The <br />previously approved SEDCAD demonstration for Pond D (Exhibit 2.05 -E3 Section 10y) also specified a <br />primary spillway elevation of 6166.0'. The SEDCAD run provided by Oxbowwith the RN -6 adequacy <br />response indicates that the spillway elevation is 6167.5'. The riser height in the currently approved run is <br />5.0'; the RN6 submittal is 5.2. Likewise, the previous version indicates a secondary spillway elevation of <br />6168.1' and the RN6 submittal is based on an elevation of 6169.5'. Please verify the spillway elevations <br />and riser height and revise the RN -6 SEDCAD runs or the Pond D Summary for consistency. <br />On Tue, Aug 27, 2013 at 2:36 PM, Bowles - DNR, Brock <brock.bowles @state.co.us> wrote: <br />Susan, <br />Elk Creek submitted a SEDCAD for Pond D. They are demonstrating that Pond D is adequate to handle the <br />runoff of the undisturbed area collected in Ditch D6. <br />Please review this SEDCAD and let me know if yo have any further questions. I will be sending out a second <br />adequacy review on Monday of next week. <br />Thanks, <br />Brock Bowles <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />303 - 866 -3567 ext. 8142 <br />https: / /mail.g oog le.conVmai I /u /0 / ?ui =2 &i k= e29129fcb5 &view = pt &search =i nboy&th= l4Oc5f8a4ffdf6e6 1/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.