Laserfiche WebLink
C fc <br />110c Annual Report <br />Page 2 of 3 <br />Permittee Name: <br />Sako Excavation, LLC <br />Permit Number. <br />M-1991-146 <br />Operation Name:_ <br />?WK Gravel Pit <br />Counw-- <br />Ouray <br />Anapal -Fee Due_,:- <br />$323.00,- - <br />Apaive saty Date: <br />August 27, 2013 <br />PeM* AmwW. <br />8.72 <br />Carreflt Bond Amt: <br />$8,151.48 <br />According to 4QJLS. 34325 -116 or 34-32 - 116,=- & year, on the anniversary date of the permit, an operaur shall submit <br />the-Annual an Annum Report and Map showing the extent of current distusbances to affected land, required <br />mo # in on,: accompli to Mate and curing the preceding yew my now disturbance that is <br />anticipated to occur dining the upcoming yam, any reclamation that will be poforarked daring the upcoming yam, the <br />dates for ilze beginaing of active operations, and the date active operations ceased for the year <br />Information contained in this report will be renewed by the Division upon receipt and prior to the next compliance <br />mWeshon ofthe site. Ii; while-complebrig ihas repot =you learn that your site4s not in caompliauce with the rules and the <br />act, it is advisable that the issues be redifie promptly -to avoid possible enfm=keat action. <br />1. Is the site identification sign posted in accordance with Rule 3 .1.12(1). <br />6"0 <br />2. Is the affected area boundary clearly marked in accordance with Rule 3 .1.12(2). (!§) NO <br />3. Is the mine site in final reclamation (ail material extraction and stockpile removal is complete)? YES NO <br />If `YES;'IAmuw-uote time=limits rela ,to completion -of reclamation, Rdea3.13. - <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine open more than -180 days per year? NO <br />If "NO", Please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES NO <br />b) approval for OPERATION? YES <br />7. Number of acres currently afi6c W ( mining + mcompletcand or um eleased reclamation). <br />8. Number of acres that were newly affected during the current report, <br />RECEIVED e <br />9. -Numbea- of acres tliat wererec4aimed during the curr+eut report year: <br />10. Estimated new acreage to be affected inthaneed report year. <br />11:_ Famed acres to ire reclaimed in the ncareport year. <br />12. Total scree in various stagei'4raclaz�a� <br />-9 <br />DIVII10N OF RECI.AMATI ' 0 <br />MININOAND SAFETY d <br />Total acres <br />back led <br />N�f } <br />Total acres <br />seeded w/ / <br />approved mixz <br />)VIA <br />Total acres <br />w il <br />laced: - <br />Af1A <br />Total acres <br />"mulched wl <br />approved mulch: <br />NIA <br />Total acres <br />graded: <br />K A <br />Total acres <br />fettiliaed w/ <br />IVIA <br />T <br />replacement <br />M/A <br />Mulch application <br />rate (touslac): <br />W4 <br />apvd fertilizer: <br />I depth. nL <br />Seed <br />applicati on <br />f q <br />F <br />I <br />'_ := <br />m1 <br />Mulch <br />method: <br />tV <br />mefiNxt- -- <br />metb�d: <br />