Laserfiche WebLink
a-D <br />112c Annual Report <br />Page 2 of3 <br />Penmittee Name: <br />Rough QA LLC <br />Permit Number. <br />M- 2001 -033 <br />Operation Nate: <br />Rough Cut Pit <br />County: <br />Otero <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />July 17 2013 <br />Permit A <br />467.00 <br />Current Bond Amt: <br />$193,000.00 <br />According to C.R.S. 3432.5 -116 or 34-32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />lnformation contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />YES NO <br />4a NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? , � i0�0 i 3 <br />S. Does the mine operate more than 180 days per year? � NO <br />If "NO", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES <br />b) approval for INTERMITTENT OPERATION? YES <br />7. Number of acres currently affected (mining + incomplete and or unreleased Vft-1V '�D. 8. Number of acres that were newly affected during the current report year. ;k.. (D.SO <br />9. Number of acres that were reclaimed during the current report year. I I I I n q 7013 $.- <br />10. Estimated new a to be affected in the next DIVISION OF MECLAW= S. D — 7.0 <br />acrrag °R MINING AND SAFE•IY <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total tyres in various stages of reclamation, since permitted mining activities began: <br />Total acres <br />ZO <br />Total acres <br />Total acres <br />ao.0 <br />Total acres <br />backfilled: <br />-O <br />seeded w/ <br />.4— <br />w /topsoil <br />mulched w/ <br />�- <br />approved mix <br />laced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />�D. j� <br />fertilized w/ <br />4G -- <br />replacement <br />rate (tons/ac): <br />�.._ <br />vd fertilizer: <br />depth (in.): <br />Seed <br />Fertilizer <br />Mulch <br />application <br />—49- <br />application <br />--8"- <br />application <br />method: <br />method: method: <br />method• <br />