My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-28_PERMIT FILE - C1992080
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992080
>
2008-01-28_PERMIT FILE - C1992080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:21:41 PM
Creation date
5/15/2013 9:14:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
Permit File
Doc Date
1/28/2008
Section_Exhibit Name
Section 2.05 Operation and Reclamation Plan
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 2.05 OPERATION AND RECLAMATION PLAN <br />• <br />2.05.1 Ohiectives <br />Oakridge's objective for Section 2.05 is to submit a comprehensive, reliable plan of operations and a <br />reclamation plan consistent with available environmental resources information and in compliance <br />with the provisions of this Section. Information responsive to the Operations and Reclamation Plan <br />requirement have been set forth in the following pages. <br />2.05.2 Operation Plan -Estimated Area for the Life of the Operations <br />At this time no further coal mining will occur at the Carbon Junction Mine. <br />The original box cut spoil from the North Pit and South Pit was placed in the permanently reclaimed <br />spoil area. Stability of this area was investigated and confirmed during the initial permitting of the <br />mine and construction of the box cut spoil area. This azea has an engineered underdrain and was <br />constructed in lifts to ensure long-term stabi&ty. <br />2.05.2(11 Production Methods and Eauioment <br />• <br />No fiuher coal mining will occur at the Carbon Junction Nfine under this permit. Remaining <br />activities will be Limited to those necessary to reclaim the mine and monitor reclamation. <br />2.05.2(2) Operation Description <br />Activities at the Carbon Junction Mine are soley related to reclamation and monitoring. The mine <br />plan map revised in 2002 shows two foot contour intervals derived from aerial photography in the <br />1st quarter of 2002. The base topographic map was developed by La Plata County. <br />The breakdown of current acreage at the Carbon Junction Mine is as follows: <br />Area Description Acreage <br />I . North Pit 7. I S <br />2. Permanently Reclaimed Spoils Area 8.56 <br />3. Topsoil Stockpile #2 2,64 <br />4. Topsoil Stockpile #4 3.30 <br /> <br />TR09, TRtl, TRt2, TRt3 <br />03/06 <br />SI Revised 3/98, 8/02, 9/03, <br />~~~faYe~l ~/7/zoos <br />T~ -/3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.