My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-03-20_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2013-03-20_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:18:42 PM
Creation date
3/20/2013 3:30:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
3/20/2013
Doc Name
ACCEPTANCE OF AS-BUIILT CERT. REPORT FOR LOB LINER EXPANSION
From
DRMS
To
CC&V
Email Name
PSH
TAK
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />March 20, 2013 <br />Mr. Timm Comer <br />Manager Environmental Resources <br />Cripple Creek & Victor Mining Co. <br />P. O. Box 191 <br />Victor, Colorado 80860 <br />Re: Cripple Creek & Victor Mining, Co., Cresson Project, M- 1980 -244 <br />Acceptance of As -Built Certification Report for LOB Liner Expansion <br />Dear Mr. Comer, <br />The Division of Reclamation, Mining and Safety (Division) has reviewed the Cresson Project Quality <br />Assurance Monitoring and Test Results report for the LOB Liner Extension dated November 7, 2012. <br />The following adequacy issues must be addressed to the satisfaction of the Division prior to the <br />Division accepting the post construction certification and as -built report. <br />1. In Section 2.0 Summary of Earthwork Construction, the Operator states Table 2 presents a <br />summary of the weather during the period of October 10 through October 12 2011 for the <br />construction activities. Table 2 presents a summary of the weather during the period of <br />October 10 through October 13 2011. Please explain this discrepancy and correct the <br />report as needed. <br />2. In Section 2.4 Bedding Fill (above installed geomembrane), the Operator refers twice to Drain <br />Cover Fill (DCF). The Division believes the Operator intended to refer to Bedding Fill (BF). <br />Please review and correct the section as needed. <br />If you have any questions, please do not hesitate to call me at (303) 866 -3567 ext. 8124. <br />Peter S. Hays <br />Environmental Protection Specialist <br />Cc: Tom Kaldenbach, DRMS <br />Tim Cazier, DRMS <br />STATE OF COLORADO <br />COLORADO <br />D I V I S I O N O F <br />RECLAMATION <br />MINING <br />—&— <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta Pineda <br />Director <br />Office of Office of <br />Mined Land Reclamation <br />Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.