My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-14_REVISION - C1980006
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980006
>
2013-01-14_REVISION - C1980006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:05 PM
Creation date
1/14/2013 1:13:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
REVISION
Doc Date
1/14/2013
Doc Name
Addendum to Final Phase III Bond Release
From
Energy Fuels Coal, Inc
To
DRMS
Type & Sequence
SL5
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
energy fuels coal, inc. <br />southfield mine • post office box 459 florence, colorado 81226 • (719) 784 -6395 <br />January 10, 2013 skt.c --� <br />Mr. Rob Zuber — Reclamation Specialist <br />Division of Reclamation, Mining & Safety <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RE: ADDENDUM to Final Phase III Bond Release Reqst — SL -05 <br />Kerr Coal Company - Kerr (Marr) Mine - Permit No. C -80 -006 <br />Dear Rob Zuber: <br />If you have any questions or concerns, please contact me. <br />Sincerely, <br />rge /. Patterson <br />Kerr Coal Company <br />1 00 <br />ion, <br />Q4yI%Sior a t1 <br />Accordingly, the Loadout Area Phase 3 Bond Release Area Map, Map 2, has been <br />revised to include all of the Loadout site and access road and is included with this <br />submittal for your review and replacement with the SL -05 Release Request. <br />L'1 <br />Thank you for drawing our attention to the error previously submitted on the map, <br />Loadout Area Phase 3 Bond Release Area Map, Map 2. The error pertained to the <br />highlighted area on the map that was to depict the Phase 3 Bond Release area at the <br />Kerr Loadout site. Realizing that the Loadout area was not yet eligible for Final Bond <br />Release at the time that Phases 1 & 2 were approved, as you pointed out, the map for <br />SL -05 should have highlighted all of the Loadout area for the Phase 3 Release <br />Request. <br />Also, a hard copy of the proof of publication concerning notice of SL -05 from the <br />local Jackson County Star newspaper is enclosed for your file. <br />Copies of the USPS certified mail return /receipts pertaining to notices to the <br />adjacent land owners and other listed entities of concern are enclosed herewith to be <br />added to the SL -05 Release Request. A few of the notices were returned to sender with <br />no known forwarding address. Copies of those returned are also enclosed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.