My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1983-03-07_REPORT - M1977493 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977493
>
1983-03-07_REPORT - M1977493 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2020 7:10:28 PM
Creation date
1/9/2013 7:08:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REPORT
Doc Date
3/7/1983
Doc Name
1982- AF & RPT
From
Climax
To
MLRB
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II I I II I II�II IIII III <br /> 999 <br /> CLIMAX MOLYBDENUM COMPANY <br /> AMA>(MOLYBDENUM DIVISION <br /> AMAX INC. <br /> EXTERNAL AFFAIRS <br /> February 28 , 1983 �� <br /> 0 <br /> RECEIVED <br /> Davis Holder, Chairman MAR 071983 <br /> Mined Land Reclamation Board <br /> Centennial Building, Room 423 MINED LAND RECLAMATION <br /> 1313 Sherman Street COLO0 DEPT, OF NATURAL RESOURCES <br /> Denver, Colorado 80203 <br /> u " <br /> Re: 1982 Annual Report - Climax Mine Permit No. 77-493 <br /> Dear Mr. Holder: <br /> For approximately seven and one-half months of 1982, the <br /> Climax Mine operated at about 31,300 tons per day, initially <br /> on a seven-day and later, a five-day schedule. The average <br /> total work force during that time period was about 1600 <br /> people. From the end of September 1982 , to the end of the <br /> year, employment averaged 354 people. Presently, it is <br /> planned that approximately 262 full-time employees will <br /> maintain a reduced level of operation throughout 1983. The <br /> Grade 1 and Grade B molybdenum concentration circuits <br /> continue producing at the rate of approximately 21,000 pounds <br /> per day on a seven-day schedule to fulfill demand for that <br /> product. Ongoing construction projects include: <br /> 1. The East Tailing Delivery Line Project which includes <br /> installation of a new camp tailing line to route tailing <br /> to a new tailing distribution house located just north <br /> of the gatehouse (see map) . The old tailing <br /> distribution house was torn down and the area regraded. <br /> 2. The Mill Cyclone Expansion Project, which consists of <br /> replacing and upgrading the mill cyclone pumping system <br /> to obtain greater efficiency. <br /> 3. The Storke Level Wastewater Plant Project, which <br /> consists of constructing new concrete lined settling <br /> ponds and pumping facilities to handle waste water and <br /> industrial runoff from the Storke Level. <br /> 1707 Cole Boulevard • Golden, Colorado 80401 9 303/234-9020 • TWX: 910.937-0746 <br />
The URL can be used to link to this page
Your browser does not support the video tag.