Laserfiche WebLink
DATE: December 24, 2012 <br />TO: Michael A. Cunningham <br />DEPARTMENT OF NATURAL RESOURCES <br />DIVISION OF WATER RESOURCES <br />Response to Reclamation Permit Application Consideration <br />RE n ' <br />CC: Division 1 Office, District 65 Water Commissioner <br />FROM: Keith Vander Horst a re w V(___ 1 %/ <br />RE: File No. M- 1997 -015, Elrick Pit Amendment <br />Operator: Washington County <br />Section 11, Township 5 North, Range 51 West, 6 P.M., Washington County <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Dick Wolfe, P.E. <br />Director /State Engineer <br />DEC2 zo;Z <br />Division of <br />Mining & SzifTf y. <br />CONDITIONS FOR APPROVAL <br />• The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water <br />must not occur during or after mining operations. <br />❑ The proposed operation will consume ground water by: ❑ evaporation, ❑ dust control, ['reclamation, <br />❑ water removed in the mined product, ❑ processing, ❑ other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable. However, prior to obtaining a permit, an approved water supply <br />plan or decreed plan for augmentation is required. <br />❑ Prior to approving a well permit, the applicant must conduct a field inspection of the site and document <br />the locations of all wells within 600 feet of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or request a hearing before the <br />State Engineer. <br />❑ The proposed operation may have potential impact on existing water rights near the project location. <br />Applicant needs to demonstrate that the proposed project will not alter or impact the historic operation of <br />existing water rights. <br />❑ The applicant has indicated plans to use other water for purposes at the permit site. The source of <br />water for this use is to be obtained from . Applicant needs to document that this water was diverted <br />in priority under a water right decreed for such industrial use. Applicant should contact the water <br />commissioner for further information. <br />• The applicant has not identified any proposed use of water at the permit site. If water will be used for any <br />purpose at this site, the applicant will need to document that the water was obtained from a legal source, <br />the water was diverted in priority under a water right decreed for such industrial use or the use of water <br />was approved by the Colorado Ground Water Commission for such industrial use. <br />Office of the State Engineer <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303 - 866 -3581 • Fax: 303 - 866 -3589 <br />http://water.state.co.us <br />