My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-18_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2012-12-18_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:29 PM
Creation date
12/19/2012 1:26:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
12/18/2012
Doc Name
Memo Regarding Reclamation Cost Estimate
From
Susan Burgmaier
To
Marcia Talvitie
Type & Sequence
SL13
Email Name
SLB
MLT
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 18, 2012 <br />To: Marcia Talvitie <br />From: Susan Burgmaier � 4-K <br />Re: New Horizon Mine (Permit No. C- 1981 -008) <br />Phase I/III Bond Release Request (SL -13) <br />Reclamation Cost Estimate <br />I have completed a revised cost estimate for remaining reclamation liability following the <br />proposed Phase I and Phase III Bond Release (SL -13) at the New Horizon Mine. After the <br />proposed release with SL -13, the estimated cost for reclamation is $5,113,540.41. <br />It is my understanding that the Division will be approving Phase I release on 100.159 acres of <br />regraded pit area and Phase III release on 7.215 acres of county road reclamation. This cost <br />estimate is based on that approval. <br />Since the reclamation cost had not been calculated since June of 2009, I updated the entire <br />reclamation cost estimate. Aside from the typical increases in equipment operating costs, which <br />are substantial since it has been three years since the last estimate, there were a few major <br />changes to the estimated reclamation costs. Specifically — <br />• Earthmoving volumes increased substantially, since the pit is now at maximum length <br />for the permit term. <br />• Revegetation costs rose due to modifications to the revegetation plan and postmining <br />land uses approved in PR6. <br />• Irrigation costs were reduced since the area to be irrigated was reduced with PR6, and <br />also costs per acre are lower than in 2009. <br />Prior to this bond release, the estimated reclamation cost for the entire site was $5,042,302.00; <br />the current estimate with SL13 is $5,113,540.00. WFC will need to post an additional $71,238.00 <br />bond. The revised reclamation cost estimate packet is attached. Should you or the operator have <br />questions or need additional information, please let me know. <br />cc: Sandy Brown, w /out enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.