My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-11-01_REPORT - M1977493
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977493
>
1996-11-01_REPORT - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2021 6:23:14 PM
Creation date
12/10/2012 7:27:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REPORT
Doc Date
11/1/1996
Doc Name
Eagle Park Reservoir
From
DMG
To
Climax
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III <br /> 999 <br /> STATE OF COLORADO <br /> 1/DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources PONT iW, <br /> 1 313 Sherman St, Room 21 5 <br /> Denver,Colorado 80203 <br /> Phone (303)866-3567 <br /> FAX:(30 3)832-8106 <br /> DEPARTMENT OF <br /> NATURAL <br /> RESOURCES <br /> t"N ovember 1 1996 Roy Romer <br /> � Governor <br /> Mr. Bryce Romig Executive Director <br /> Climax Molybde m Company Michael B Long <br /> Climax Mine Division Director <br /> Climax, CO 80249 <br /> RE: Eagle Park Reservoir, Climax Mine, Permit No. M-77-493 <br /> Dear Mr. Romig: <br /> Thank you for the submittal of the "Completion Report for Eagle Park <br /> Reservoir (Climax Moly #4) Outlet Works Construction" prepared by W.W. <br /> Wheeler and Associates, Inc. Submittal of this report satisfies the <br /> requirement of Rule 7 . 3 .2 (2) of the Hard Rock/Metal Mining Rules and <br /> Regulations of the Mined Land Reclamation Board to provide certification <br /> that Environmental Protection Facilities are constructed in accordance <br /> with the approved design plan. The Division has reviewed the completion <br /> report, but has determined that acceptance of the report and certification <br /> will be deferred pending a finding by the Dam Safety Section of the Office <br /> of the State Engineer. Please notify me once the State Engineer has <br /> provided an "Acceptance of Construction" required under Rule 10 of the <br /> Rules and Regulations for Dam Safety and Dam Construction. <br /> If you have any questions, please contact me. <br /> Sincerely, <br /> Allen C. Sorenson <br /> Reclamation Specialist <br /> C:\WP51\CLIMAX3.4DM <br />
The URL can be used to link to this page
Your browser does not support the video tag.