Laserfiche WebLink
ta.ft <br />of <br />Colorado <br />Re: Bowie No. 2 Mine C1996083 Technical Revision No. 76 - Request for <br />Assistance <br />Burgmaier - DNR, Susan <susan.burgmaier @state.co.us> Thu, Dec 6, 2012 at 11:04 AM <br />To: Marcia Talvitie - DNR <marcia.talvitie @state.co.us> <br />Cc: Alysha Hernandez - DNR <alysha.hernandez @state.co.us >, Mary Rodriguez - DNR <br /><mary.rodriguez @state.co.us >, Sandy Brown - DNR <Sandy.Brown @state.co.us> <br />Correction - adequacy comments are due December 23, 2012. <br />Susan L. Burgmaier <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver CO 80203 <br />303 - 866 -3567 x 8111 <br />www.mining.state.co.us <br />On Thu, Dec 6, 2012 at 10:52 AM, Burgmaier- DNR, Susan <susan,burgmaier @state,co,us> wrote: <br />Hi Marcia - We received a revision for the expansion of Gob Pile #2 at the Bowie No. 2 Mine. The expansion <br />will fill in the draw between Gob Piles #2 and #4 (we met with Tamme Bishop and Bill Bear on this proposal on <br />September 20, 2012). Will you please review the revision for adequacy regarding stability of the pile? <br />Adequacy comments are due out on December 3, 2012, so if you could get your comments to me by Friday <br />the 21 st that would be great. Sorry for the late request - for some reason I thought I had already requested <br />your assistance. I'm not sure if Tamme sent you a copy of the revision or not - please let me know if you need <br />a copy. <br />Susan L. Burgmaier <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver CO 80203 <br />303- 866 -3567 x 8111 <br />www.mining.state.co.us <br />