Laserfiche WebLink
A <br /> STATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources POW74, <br /> 1313 Sherman St., Room 215 <br /> Denver,Colorado 80203 <br /> Phone:(303)866-3567 <br /> FAX-(303)832-8106 <br /> DEPARTMENT OF <br /> NATURAL <br /> RESOURCES <br /> DATE: April 27, 1997 <br /> / Roy Romer <br /> Governor <br /> 1/,TO: File No. M-7 7-4 9 3 James S Lochhead <br /> Executive Director <br /> I/ ROM: Allen Sorenson Michael B.Long <br /> Division Director <br /> RE: ) Assumptions Necessary to Complete Preliminary Cost Estimate <br /> j/ for Structural Demolition at the Climax Mine <br /> In a memorandum dated November 16, 1993 prepared by Tom Gillis, the <br /> Division provided Climax Molybdenum Company (CMC) a list detailing <br /> information required to facilitate cost estimation for structural <br /> demolition at the Climax Mine. CMC' s response package dated April 1, <br /> 1994 provides most of the required information, and this information is <br /> the basis for the Division' s preliminary estimate of demolition costs . <br /> Where data gaps existed, certain assumptions were incorporated into the <br /> preliminary estimate . This memo details these assumptions, and <br /> illustrates what type of information will be needed to refine the cost <br /> estimate . <br /> 1 . There is no information in the 4/1/94 CMC response package <br /> detailing the thickness of concrete slabs for the various <br /> buildings at the Climax Mine. These thicknesses were estimated <br /> for the purpose of the preliminary cost estimate . The thicknesses <br /> estimated are based on the size and use of each building, e .g. , <br /> mill or crusher buildings would have thicker slabs than small <br /> dispatch shacks or office buildings . If CMC provides data on slab <br /> thickness, this aspect of the demolition cost estimate can be <br /> refined. <br /> 2 . There is no information in the 4/1/94 CMC response package <br /> detailing the dimensions of the footings for each structure . <br /> Footing dimensions were estimated for the purpose of the <br /> preliminary cost estimate . It was assumed that footings were <br /> installed around the entire perimeter of each slab. The thickness <br /> and width of each footing was estimated based on the size and use <br /> of each building (see item #1 above) . If CMC provides data on <br /> footing dimensions, this aspect of the demolition cost estimate <br /> can be refined. <br /> 3 . In the Gillis memo dated 11/16/93 , the Division requested <br /> information on dimensions for all curb/stem/retaining walls and <br /> equipment pedestals that would not be covered by at least 3 ' of <br /> fill in the reclaimed landscape . CMC provided data on what is <br />