Laserfiche WebLink
0 <br />7,600 <br />7,400 <br />7,200 <br />w <br />LL <br />i <br />.2 7,000 <br />cc <br />W <br />6,800 <br />6,400 <br />0 <br />RPE East Refuse Capacity <br />No Name Gulch <br />1.25 Tons /CY <br />Service Life (Years) <br />10 20 30 40 50 <br />7,600 <br />7,400 <br />7,200 <br />Ll <br />7,000 p <br />W <br />. .11 <br />6,400 <br />1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 12,000 13,000 <br />Note: Service life is based on a refuse <br />generation rate of 300,000 tons per <br />year, with a conversion ratio of 1.25 tons <br />per cubic yard. Colluvium excavated <br />from foundation is placed in refuse pile. <br />Storage Capacity - CY (x 1,000) <br />- - - Permit Envelope 2.5H:1 V Slope <br />— Permit Design - 2.5H:1 V Slope w/ Haul Road Benches <br />— — 2.5H:1 V Slope w/2 x 300 -Ft Benches <br />P: \Mpls \06 CO\26 \06261003 MCC Refuse Pile Site Review & Perm it \WorkFiles \RPE East and Buttress Design \RPE East Volume Calc \Refuse Pile Stage- Storage Volume PTS2 1/7/2010 <br />.• <br />• <br />. <br />7,600 <br />7,400 <br />7,200 <br />Ll <br />7,000 p <br />W <br />. .11 <br />6,400 <br />1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 12,000 13,000 <br />Note: Service life is based on a refuse <br />generation rate of 300,000 tons per <br />year, with a conversion ratio of 1.25 tons <br />per cubic yard. Colluvium excavated <br />from foundation is placed in refuse pile. <br />Storage Capacity - CY (x 1,000) <br />- - - Permit Envelope 2.5H:1 V Slope <br />— Permit Design - 2.5H:1 V Slope w/ Haul Road Benches <br />— — 2.5H:1 V Slope w/2 x 300 -Ft Benches <br />P: \Mpls \06 CO\26 \06261003 MCC Refuse Pile Site Review & Perm it \WorkFiles \RPE East and Buttress Design \RPE East Volume Calc \Refuse Pile Stage- Storage Volume PTS2 1/7/2010 <br />