My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-11-13_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2012-11-13_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:10:31 PM
Creation date
11/13/2012 1:39:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
11/13/2012
Doc Name
Adequacy Review Comments
From
Colowyo Coal Company
To
DRMS
Type & Sequence
SL6
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 9, 2012 <br />COAL <br />ic .YCOMPANY o4 <br />.pgo raoaocr1O$ <br />5731 State Highway 13 • Meeker, Colorado 81641 <br />Mr. Rob Zuber <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />• 970- 824 -1500 <br />RECEIVED <br />NOV 1 3 2012 <br />Division of Reclamation, <br />Mining & Safety <br />RE: Colowyo Coal Mine, Permit C- 1981 -019, Bond Release Application No. 6 <br />(SL -06), Adequacy Review Response <br />Dear Mr. Zuber, <br />Colowyo received comments in regards to SL -06 from the Colorado Division of <br />Reclamation Mining and Safety (Division) on September 7, 2012. Colowyo has <br />the following responses to the Division's comments: <br />• In the North Tributary of the East Pit Ditch there is a bare spot below the <br />NTEP Pond. This reach of the channel should have riprap armoring per <br />the design in the PAP. However, there is no erosion in the channel. <br />Response: This is Structure No. 8 in the SEDCAD Model. This segment has <br />been re- evaluated and modeled as a vegetative lined channel. It was <br />found to have acceptable peak velocity (4.99 fps) for a vegetative lined <br />channel. Refer to the attached SEDCAD output "NTEPD 1024 2017', and <br />follow the model to Structure No. 8. A grass lined channel will suffice for <br />this section of ditch. <br />• In Prospect Ditch, in the reach between the ponds, the channel is not well <br />shaped and is eroded. Below the lower pond (PD1) riprap is sparse in <br />some areas. <br />Response: The reach in between the ponds (vegetated channel not riprap <br />lined) was re- shaped and re- seeded accordingly. No additional work or <br />response is necessary. <br />The lower reach below PD1 is Structure No. 32 in the SEDCAD Model. This <br />segment has been re- evaluated and modeled as a vegetative lined <br />channel. It was found to have acceptable peak velocity (2.12 fps) for a <br />vegetative lined channel. Refer to the attached SEDCAD output "Prospect <br />A Western Fuels - Colorado, LL(. ruining property <br />
The URL can be used to link to this page
Your browser does not support the video tag.