Laserfiche WebLink
Total acres <br />backfilled: 4 - <br />1 ON+- <br />Total acres <br />seeded w/ <br />approved mix: c--No <br />NE <br />Total acres <br />w /topsoil <br />replaced: <--No", <br />i t <br />Total acres <br />mulched w/ <br />approved mulch: '-N6 <br />/, <br />Total acres <br />graded: <N <br />r a <br />Total acres <br />fertilized w/ <br />apvd fertilizer: E. <br />r <br />Topsoil <br />replacement <br />depth (in.): <br />Ator+c <br />Mulch application <br />rate (tons): fr/VONC <br />$1,100.00 <br />Seed <br />application <br />method: 4. <br />NA <br />Fertilizer <br />application <br />method: .- <br />N/At, <br />Mulch <br />application <br />method: 4--■ <br />/A <br />Permittee Name: <br />Joseph Curtis Harden <br />Permit Number: <br />M- 2004 -008 <br />Operation Name: <br />The Mountain Mining Claim <br />County: <br />Clear Creek <br />Annual Fee Due: <br />$259.00 <br />Anniversary Date: <br />October 28, 2012 <br />Permit Acreage: <br />0.50 <br />Current Bond Amt: <br />$1,100.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the annive ry date of the permit, an operator shall submit <br />thy( nnual Fes, an Annual 120.0. and Man showing the extent of cure , isturbances to affected nci) (equired <br />mdnftoring informatioi (recla accomplished to date}and Burin e`ireceding year any ne isturbance is <br />(anticipat to oc during the upc8ing year)/any reclamation that w b ; ormed during the upcoming yea4,6he <br />`dates for theteglrifiing of active operations ana the date active operations c - . ed for the year) <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />110(2) Annual Report T <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />OCT 23?U <br />DWISION W � WE <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Page 2 of 3 <br />NO <br />NO <br />,ry r /44, 2v12 <br />NO <br />YES N O <br />YES <br />to T1- Ac.AF,. <br />110 s FT <br />NbNe <br />Sa03v <br />NON <br />